Loading...
ST9902-LR060413 (2) -In-Place Soil Moisture/Den~ Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: City of Coppel! Project: West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppell (1) City of Coppell (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-023 Report Date: 04/13/2006 Specifications Percent Compaction: +95% min +100% max Moisture Content: opt +0% to +5% Test Data Date Tested: 04/10/2006 Technician: Joshua Davis 2208 Test Method ASTM D-698 Material Description Tan and Dark Brown Silty Clay Optimum Maximum Dry Moisture % Density pcf Curve No. 21.0 100.5 In-Place Test Results Test No Elevation or Lift Location Ref. Probe Percent Wet Density Dry Density Curve Depth Moisture (pet) (pet) 2208 6" 21.1 97.9 2208 6" 23.1 96.2 2208 6" 21.9 96.2 2208 6" 21.7 96.1 'i" \ ~ 99.0 100.0 101.0 102.0 Final -1.0'BFG Final -1.0' BFG Roadway Embankment ** Sta. 5+41.93 Sta. 5+41.93 Sta. 6+51.15 Sta.6+51.15 Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 {BFG} Below Final Grade ** Roadway Embankment STORM DRAIN LINE "A" & "B" Gauge: Humboldt Gauge SN: 5000 Std. Density Count: 37 CMJ Engineering, I LIMITATIONS: The test results presented in this report apply only to the specific samples, item ,and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 07 Page 1 of 1