ST9902-LR060405
Moisture-Density Relationship
eM J ENGINEERING, INC
7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993
Client:
Project:
City of Coppell
West Sandy Lake Road
Reconstruction
Report Distribution: (1) City of Coppel!
(1) City of Cappel!
(1) Tiseo Paving Company
(1) Teague Nail & Perkins
CMJ Report No.: 687-5192-018
Report Date: 04/05/2006
Project Information
Material Origin:
Sample Location:
Material Oescription:
Material Use:
Haul In
Drainage Culvert East of Royal Lane
Orange Brown Clayey Sand w/Cement
Trench/Utility Backfill
Moisture-Density Relationship - Curve No. 2351
Tested By: Josh Bridges
Sample Date: 03/31/2006
110
108
Dry
Density
(pet)
106
104
102
lQO%S atura io~
.,~""'-~ .,m
~ ;I" : ,
lr I \
/ : ~, I
I I 1\ I I
J I \
f, I \ :
i I
J i I \
J I \ I
6 8 10 12 14 16 18
Moisture Content ('Yo)
Material Properties and Test Information - Curve No. 2351
Maximum Dry Density: 108.0
Optimum Moisture Percent: 11.5
Test Method(s):
ASTM 0-698
Rammer Description:
Mechanical
Preparation Procedure: Moist
CMJ Engineering, Inc
LIMITATIONS: The test results presented in this report apply only to the specific samples, items, an areas described within this report. The test results
do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our
client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc.
Page 1 of I