Loading...
ST9902-LR060317 Moisture-Density Relationship eM J ENGINEERING, INC 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: City of Coppell West Sandy Lake Road Reconstruction Report Distribution: (1) City of Coppel! (1) City of Cop pel! (1) Tiseo Paving Company (1) Teague Nail & Perkins CMJ Report No.: 687-5192-013 Report Date: 03/17/2006 Project Information Material Origin: Sample Location: Material Description: Material Use: Haul In Stockpile Gray Brown Silty Sand w/Rock and Gravel & Trace of Lime Flex Base Tested By: Shawn Wood Sample Date: 03/14/2006 Moisture-Density Relationship - Curve No. 2308 11il 116 Dry Density (pet) 114 112 110 " leO%S tura ion (no: 17m! ./ ~ '" \ I I \ \ I : \ r\ I \ \ , f I \ , I la I I \ \ , I \ : ; I \ \ I \ I ! \ \ : . I r\ J . 9 11 13 15 17 19 21 Moisture Content ('Yo) Material Properties and Test Information - Curve No. 2308 Maximum Dry Density: 117.0 Optimum Moisture Percent: 13.5 Test Method(s): ASTM 0-698 Rammer Description: Mechanical Preparation Procedure: Moist CMJ Engineering, Inc LIMITATIONS: The test results presented in this report apply only to the specific samples, items, and areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are produced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written consent of our client and CMJ Engineering, Inc. 06 Page 1 of 1