Loading...
Coppell Heights 9-CS060601 DEVELOPMENT FEE TABLE Project: Date: 6/1/2004 ~ N 'fll/ttl Pr~,/ TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROV AL Water Impact Fee $9,660.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $300.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $565.44 (100% due at Issuance of Water Meter) Water Meter Fee (IrrigationlFireline) $4,157.48 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $90.00 (100% due at Issuance of Water Meter) IrrigationlFireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $6,720.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $150.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $150.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $32,319.00 $32,319.00 (100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) II Street Sign Fee Information not Available (100% due prior to Acceptance of Project) II Construction Inspection Fee Information not Available (100% due prior to Start of Construction) ITOT AL II $54,201.921 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $32,319.00 DEVELOPMENT FEE WORKSHEET PROJECT: DATE: 6/1/2004 Water Impact Fee: Domestic Meter(s): Irrigation Meter( s): Fireline Meter(s): 3 - 2 inch 1 - 2 inch o 2 - 8 inch = 24 ESU's = 8 ESU's = 0 ESU's = 2.5 ESU's Total #: 34.5 ESU's @ $280.00 ea. (Due prior to issuance of building permit) $9,660.00 Water Tap Inspection Fee: Total #: 6 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $300.00 Domestic Water Meter Fee: Total #: 3 Domestic Meter(s) @ $188.48 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $565.44 Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 2 Fireline Meter(s) @ (100% due prior to issuance of water meters) $188.48 $0.00 $1,984.50 $188.48 $0.00 $3,969.00 Domestic Water Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $90.00 Irrigation/Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) $90.00 Wastewater Impact Fee: Total Domestic Meters ESU's: 24 @ $280.00 ea. (Due prior to issuance of building permit) $6,720.00 Wastewater Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (100% due prior to issuance of building permit) $150.00 Utility Final Inspection Fee (All developments): Total #: 3 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $150.00 Park Fee (For Residential Developments Only): Page 1 DEVELOPMENT FEE WORKSHEET * Preliminary plat approved: After October 26, 1993 o o Single-family @ $0.00 per lot Multi-family @ $0.00 per unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T. U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 $0.00 $0.00 $32,319.00 Information not Available Information not Available Information not Available ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: o 61112004 ROADWAY IMPACT FEE: Service Area * 6 Category * * Office Land Use ** General Office Bldg. Building Area (sf) 27,000 Development Units ** 27.00 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $32,319.00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) 1:.AMOUiV:tt#!t//:..... . "" . ""$' . . ;3.' . . . . . . ~ . . .. 32' 1900' ~:~:~:~: :"." ::. ~ ~ .,~ . ~: . . .. ... ........