Coppell Heights 9-CS060601
DEVELOPMENT FEE TABLE
Project:
Date: 6/1/2004
~
N
'fll/ttl Pr~,/
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROV AL
Water Impact Fee $9,660.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $565.44
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigationlFireline) $4,157.48
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $90.00
(100% due at Issuance of Water Meter)
IrrigationlFireline Meter Deposit $90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $6,720.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $150.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $150.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $32,319.00 $32,319.00
(100% due prior to Council Approval)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
ITOT AL II $54,201.921
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $32,319.00
DEVELOPMENT FEE WORKSHEET
PROJECT:
DATE: 6/1/2004
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter( s):
Fireline Meter(s):
3 - 2 inch
1 - 2 inch
o
2 - 8 inch
= 24 ESU's
= 8 ESU's
= 0 ESU's
= 2.5 ESU's
Total #:
34.5 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
$9,660.00
Water Tap Inspection Fee:
Total #:
6 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$300.00
Domestic Water Meter Fee:
Total #: 3 Domestic Meter(s) @ $188.48
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$565.44
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: 2 Fireline Meter(s) @
(100% due prior to issuance of water meters)
$188.48
$0.00
$1,984.50
$188.48
$0.00
$3,969.00
Domestic Water Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$90.00
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
$90.00
Wastewater Impact Fee:
Total Domestic Meters ESU's: 24 @ $280.00 ea.
(Due prior to issuance of building permit)
$6,720.00
Wastewater Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
$150.00
Utility Final Inspection Fee (All developments):
Total #: 3 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$150.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
o
o
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T. U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
$0.00
$0.00
$32,319.00
Information not Available
Information not Available
Information not Available
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
o
61112004
ROADWAY IMPACT FEE:
Service Area * 6
Category * * Office
Land Use ** General Office Bldg.
Building Area (sf) 27,000
Development Units ** 27.00
Vehicle Miles per Development Unit ** 3.99
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $32,319.00
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
1:.AMOUiV:tt#!t//:..... .
"" . ""$' . . ;3.' . . . . . . ~
. . .. 32' 1900'
~:~:~:~: :"." ::. ~ ~ .,~ . ~:
. . .. ... ........