Gateway BP(1.6)-LR061014REPORT OF REINFORCING STEEL OBSERVATION l~err~can
Consultlnp Enplneers & Sclentlsts
8901 Carpenter Frwy., Suite #100
Dallaz, Texaz 75247
(2]41630-1010
Date of Service: 10/14/06
Client No.: 47876
Client: ProLogis
2310 LBJ Freeway Ste 200
Dallas, TX 75234
Report No.: 94061163.0121
Project No.: 94061163
Project: Freeport Corporate Ctr. Bldg. 6
Freeway Pkwy & Gateway
Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: Sheet C1.11, dated 04/26/06
Locations/Items Observed: N & S Approaches along Freeport Pkwy
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash & Debris Removed ~ Proper ear Supports X Lapped Splices X
Number of Bars X Proper CoverlClearance X
DiscrepancieslComments: No discrepancies were noted at the time of this observation.
Field Results Report To:
Technician: J.A. Martinez
Report Distribution:
(1) ProLogis
(1) City of Coppell TX
(1) City of Coppell TX
(1) Haynes Whaley Assoc Inc
(1) Meinhardt & Assoc Architects Pl
(1) Jordan Construction Services
(1) Meinhardt & Assoc Architects PLLC
Robert D. Ray, .T.
Senior Project anager