Loading...
Gateway BP(1.6)-LR061014REPORT OF REINFORCING STEEL OBSERVATION l~err~can Consultlnp Enplneers & Sclentlsts 8901 Carpenter Frwy., Suite #100 Dallaz, Texaz 75247 (2]41630-1010 Date of Service: 10/14/06 Client No.: 47876 Client: ProLogis 2310 LBJ Freeway Ste 200 Dallas, TX 75234 Report No.: 94061163.0121 Project No.: 94061163 Project: Freeport Corporate Ctr. Bldg. 6 Freeway Pkwy & Gateway Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: Sheet C1.11, dated 04/26/06 Locations/Items Observed: N & S Approaches along Freeport Pkwy Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape X Column Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed ~ Proper ear Supports X Lapped Splices X Number of Bars X Proper CoverlClearance X DiscrepancieslComments: No discrepancies were noted at the time of this observation. Field Results Report To: Technician: J.A. Martinez Report Distribution: (1) ProLogis (1) City of Coppell TX (1) City of Coppell TX (1) Haynes Whaley Assoc Inc (1) Meinhardt & Assoc Architects Pl (1) Jordan Construction Services (1) Meinhardt & Assoc Architects PLLC Robert D. Ray, .T. Senior Project anager 309aCS This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.