Sandy Lk Cross 2R-CS061031MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Keith Marvin, P.E., Asst. City Engineer
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Fire Marshal
h
From: Larry Davis, Construction Inspector Ae
Office Phone: (972) 304 -3684
Fax: (972) 304 -3570
Date: October 31, 2006
RE: WALK -THRU INSPECTION
Sandy Lake Crossing, Lot 211 (115 W. Sandy Lake Rd.)
A final walk -thru for paving, utilities and drainage on the referenced project has been
scheduled for:
Monday, November 6, 2006 at 2:00 p.m.
Please let me know if I can be of further assistance.
cc: Jack Daniels, Greenside Construction fax # 214 - 348 -8002
"CITY OH COPPELL ENGINEERING - EXCELLENCE BY DESIGN"