Loading...
Austin Place-LR 961009GIRO FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (214) 484-8301; Fax (214) 620-7326 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Standard Pacific of Texas PROJECT: Austin Place, Coppell, Texas Report Date: October 9, 1996 Project No.: 0761-2062 SAMPLE DATE: September 10, 1996 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: C. W. Young N/A CONCRETE SUPPLIER: N/A NIA PLANT/TRUCK: N/A N/A MIX ID NUMBER: N/A N/A AIR (%) (ASTM C-231) N/A N/A WATER ADDED (gal): N/A N/A SLUMP (inches} (ASTM c-143) N/A Manhole, at station 0+00, line A 8 inches sanitary sewer CONCRETE. CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi} REQUIRED COMPRESSIVE STRENGTH (psi) APC 1 16 09/26/96 85000 3007 3000/28 da 5 APC 2 28 10/08/96 105000 3715 APC 3 28 10/08/96 110000 3892 S ecifications: Makin 8 Curin ASTM C-31 Testin Methods: ASTM C-143, ASTM C-39 REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be correct. Technician: Neil Rana FUGRO-McCLELLAND (SOUTHWEST), INC. Checked SMH/rm Distribution: Standard Pacific of Texas -Randy Lockhart City of Coppell - Garreth Campbell-. C W Young