Loading...
Carter Phase 2-LR 980623Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Donald J. Carter PROJECT: Carter Addition-Phase II, Coppell, TX LOCATION OF POUR SET 1: Manhole LOCATION OF POUR SET 2: SAMPLE DATA: Truck No. Ticket No. Time Batched Time Sampled Concrete Temp. IASrM ciosal Air Content cASrM c23it Unit Weight (ASTM C1381 SET 1 SET 2 MIX NO. Cement Flyash Sand in. 1.0 in. Water Admix #1 Admix #2 AEA JOB NO.: 98.1056 DATE: 23 June 1998 SUPPLIER: COMPRESSIVE STRENGTH TESTS ~ASTM c3s- {Standard 6 inch x 12 inch cy linder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C1431 pSl Strength 1 7 06/30/98 112,100 3970 2 28 07/21/98 132,400 4680 3 28 07/21/98 140,400 4970 28-Day Average 4830 3000 NOTE: Cylinders .and all information furnished by contractor. TECHNICIAN: Contractor DISTRIBUTION: f1) Donald J. Carter, Attn: Jeff Fink (1) Needham Wright Engineers, Inc., Robert L. Wright {1) Tri-Dal Ltd., Robert Pierson { 1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148