Parkwood-CS 861006GINN, INC.
October 6, 1986
CONSULTING ENGINEERS
Mr. Skip Hynek
General Homes Land Development
15301 Dallas Parkway, #1020
Dallas, Texas 75248
Re: Parkwood III -- Final Acceptance
Dear Mr. Hynek:
A final inspection of the above referenced project has been
confirmed by representatives of Ginn, Inc., M.U.D. #1, and the
City of Coppell. '~
Paving and utilities have been verified and are in compliance
with the City of Coppell standard requirements. Commitments to
the landscape-streetscape ordinances need to be addressed within
the phase of home building.
The one-year maintenance bonds and as-built drawings have been
received from both contractors. Maturity on the bonds will be
one year from the date of this letter (10-6-86). On behalf of
the City of Coppell, acknowledgement of acceptance and the
release of building permits is effective as of this date.
Sincerely,
R
andy Fleming
/ss
cc:
Ed Powell /
Steve Goram-/
Dale Jackson
Carl Bass
Per Birdsall
Jeff Hawkins
Wayne Ginn
Gabe Favre