Loading...
Parkwood-CS 861006GINN, INC. October 6, 1986 CONSULTING ENGINEERS Mr. Skip Hynek General Homes Land Development 15301 Dallas Parkway, #1020 Dallas, Texas 75248 Re: Parkwood III -- Final Acceptance Dear Mr. Hynek: A final inspection of the above referenced project has been confirmed by representatives of Ginn, Inc., M.U.D. #1, and the City of Coppell. '~ Paving and utilities have been verified and are in compliance with the City of Coppell standard requirements. Commitments to the landscape-streetscape ordinances need to be addressed within the phase of home building. The one-year maintenance bonds and as-built drawings have been received from both contractors. Maturity on the bonds will be one year from the date of this letter (10-6-86). On behalf of the City of Coppell, acknowledgement of acceptance and the release of building permits is effective as of this date. Sincerely,  R andy Fleming /ss cc: Ed Powell / Steve Goram-/ Dale Jackson Carl Bass Per Birdsall Jeff Hawkins Wayne Ginn Gabe Favre