Coppell Greens 2-LR 991201CONCRETE INSPECTION AND COMPRESSION TEST REPORT
CLIENT: Argus Development
PROJECT: Coppell Greens
REPORT DATE: 12-01-99
REPORT NO.: 99-132..175
SPECtFICA7tONS PROJECT DATA
Stren th si : 3000 28 da s Date of Placement: 10-27-99
Slump (in.): NIA Sampled By: Contractor
Air Content (%): NIA Weather: N!A
Concrete Temp (°F): N/A Supplier/Mix: N/A
Ticket #: NIA Time Batched: N/A Time Sampled: NIA
Slump (in.): N/A Air Content (%): N/A Unit Weight (pcf): N/A
Concrete Temp (°F): N/A Air Temp (°F): N/A Yardage (cu.yd.): N/A
LocationlRemarks: Inlet
SET
NO. CYLINDER
NO. DATE
TESTED AGE
(days) MAX. LOAD
(Ibs) STRENGTH
(psi) NOTES
1-1 11-03 7 78000 2760
1 1-2 11-03 7 85000 3010
SET 1-3 11-24 28 114000 4030
1-4 11-24 28 132000 4670
Ticket #: Time Batched: Time Sampled:
Slump {in.): Air Content (%): Unit Weight (pcf):
Concrete Temp (°F): Air Temp (°F): Yardage (cu.yd.):
Location/Remarks:
SET
NO. CYLINDER
NO. DATE
TESTED AGE
da s MAX. LOAD
Ibs STRENGTH
si NOTES
2-1
2-2
Set 2-3
2-4
Ticket #: Time Batched: Time Sam led:
Slum (in.): Air Content (%): Unit Wei ht ( ct):
Concrete Temp (°F}: Air Temp (°F): Yardage (cu.yd.):
Location/Remarks:
SET
NO. CYLINDER
NO. DATE
TESTED AGE
(days) MAX. LOAD
(Ibs) STRENGTH
(psi) NOTES
3-1
3 3-2
SET 3-3
3-4
1
sn in
TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE'~IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND
TESTING, INC ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC.
ARE PER ASTM C37, TESTED PER ASTM C39
Soiltech Engineerin rid Testing, Inc
U~T~~ ~~~1~~"~t'
J es M. Perdue Materials Testing Manager ~~t~C:il
2502 Gravel Drive • Fort Worth, Texas 76118 • 817.595.0064 telephone • 817.589.7279 metro • 817.595.0708 fax