Loading...
Coppell Greens 2-LR 991201CONCRETE INSPECTION AND COMPRESSION TEST REPORT CLIENT: Argus Development PROJECT: Coppell Greens REPORT DATE: 12-01-99 REPORT NO.: 99-132..175 SPECtFICA7tONS PROJECT DATA Stren th si : 3000 28 da s Date of Placement: 10-27-99 Slump (in.): NIA Sampled By: Contractor Air Content (%): NIA Weather: N!A Concrete Temp (°F): N/A Supplier/Mix: N/A Ticket #: NIA Time Batched: N/A Time Sampled: NIA Slump (in.): N/A Air Content (%): N/A Unit Weight (pcf): N/A Concrete Temp (°F): N/A Air Temp (°F): N/A Yardage (cu.yd.): N/A LocationlRemarks: Inlet SET NO. CYLINDER NO. DATE TESTED AGE (days) MAX. LOAD (Ibs) STRENGTH (psi) NOTES 1-1 11-03 7 78000 2760 1 1-2 11-03 7 85000 3010 SET 1-3 11-24 28 114000 4030 1-4 11-24 28 132000 4670 Ticket #: Time Batched: Time Sampled: Slump {in.): Air Content (%): Unit Weight (pcf): Concrete Temp (°F): Air Temp (°F): Yardage (cu.yd.): Location/Remarks: SET NO. CYLINDER NO. DATE TESTED AGE da s MAX. LOAD Ibs STRENGTH si NOTES 2-1 2-2 Set 2-3 2-4 Ticket #: Time Batched: Time Sam led: Slum (in.): Air Content (%): Unit Wei ht ( ct): Concrete Temp (°F}: Air Temp (°F): Yardage (cu.yd.): Location/Remarks: SET NO. CYLINDER NO. DATE TESTED AGE (days) MAX. LOAD (Ibs) STRENGTH (psi) NOTES 3-1 3 3-2 SET 3-3 3-4 1 sn in TEST RESULTS COMPLY WITH PROJECT SPECIFICATIONS UNLESS INDICATED "NON-COMPLIANCE'~IN NOTES. FIELD TESTS BY SOILTECH ENGINEERING AND TESTING, INC ARE PER APPLICABLE ASTM STANDARDS: C138, C143, C172, C231. CYLINDERS MOLDED AND CURED BY SOILTECH ENGINEERING AND TESTING, INC. ARE PER ASTM C37, TESTED PER ASTM C39 Soiltech Engineerin rid Testing, Inc U~T~~ ~~~1~~"~t' J es M. Perdue Materials Testing Manager ~~t~C:il 2502 Gravel Drive • Fort Worth, Texas 76118 • 817.595.0064 telephone • 817.589.7279 metro • 817.595.0708 fax