Loading...
Coppell Greens 2-LR 990927SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argun Development REPORT DATE: 09-27-99 PROJECT: Coppell Greens REPORT NO.: 99-132.143 SPECIFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-20-99 Moisture Content (%): Technician: J Rogers MATERIAL REFERENCE CURVE DATA CURVE TEST MATERIAL DESCRIPTION MAX. DRY OPTIMUM NO. METHOD DENSITY (pCf) MOISTURE (%) 1 D-698A Li ht Brown Sand Cla 119.8 11.8 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DRY DENSITY (Pofl MOISTURE (%) % OF MAX. DRY DENSITY 1 151 Lift Storm Sewer - Line L Station 5+50 1 117.4 12.5 98 2 3rtl Lift Storm Sewer - Line L Station 5+60 1 116.6 13.0 97 3 5`" Lift Storm Sewer - Line L Station 5+70 1 118.5 12.2 99 4 Final Storm Sewer - Line L Station 5+ 80 1 117.0 12.6 98 5 15' Lift Storm Sewer - Line J Station 1+00 1 119.0 12.0 99 6 3`d Lift Storm Sewer - Line J Station 1+10 1 116.6 13.5 97 7 5"' Lift Storm Sewer - Line J Station 1+20 1 115.8 13.7 97 8 15` Lift Storm Sewer - Line J -1 Station 0+60 1 116.9 13.7 97 9 3r0 Lift Storm Sewer - Line J -1 Station 0+70 1 117.9 13.2 98 10 5"' Lift Storm Sewer - Line J -1 Station 0+80 1 117.4 12.8 98 11 Final Storm Sewer - Line J - 1 Station 0+90 1 118.1 12.3 98 2 15' Lift Storm Sewer - Line G -1 Station 0+47 1 117.0 12.9 98 13 3`d Lift Storm Sewer - Line G -1 Station 0+60 1 1 16.6 13.1 97 14 Final Storm Sewer - Line G -1 Station 0+70 I 1 17.1 13.3 98 NUCLEAR GAUGE I.D.: STD. DENSITY COUNT: AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. SOI TECH EN NEEf21 AND TESTING, INC. ,~ ~ '~~~~ a es M. Perdue Construction Materials Manager STD. MOISTURE COUNT: 2502 Gravel Drive .Fort Worth, Texas 76118.817.595.0064 telephone • 817.589.7279 metro .817.595.0708 tax soiltech SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-27-99 PROJECT: Coppell Greens REPORT NO.: 99-132.144 SPECIFICATIONS TEST DATA. Percent Compaction: 95 % Date Tested: 09-27-99 Moisture Content {%): Technician: J Brimingham MATERIAL. REFERENCE CURVE DATA CURVE TEST MATERIAL DESCRIPTION MAX. DRY OPTIMUM NO. METHOD DENSITY (pcf) MOISTURE (%) 1 D-698A Li ht Brown Sand Cla 119.8 11.8 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY- TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DENSITY (pcf) MOISTURE (%) % OF MAX. DRY DENSITY 1 6' BFG Storm Sewer - Line K Station 0+80 1 117.1 13.6 98 2 4' BFG Storm Sewer - Line K Station 0+80 1 116.3 14.2 97 3 2' BFG Storm Sewer - Line K Station 0+80 1 115.4 14.0 96 4 Final Storm Sewer - Line K Station 1+60 1 118.3 13.6 99 5 5' BFG Storm Sewer - Line K Station 1+60 1 117.7 12.7 98 6 3' BFG Storm Sewer - Line K Station 1+6p 1 116.5 12.1 97 7 1'BFG Storm Sewer - Line K Station 1+6p 1 117.9 11.9 98 8 5' BFG Storm Sewer - Line L Station 1 +50 1 119.5 12.6 100 9 3' BFG Storm Sewer - Line L Station 1+50 1 118.6 13.3 99 10 1' BFG Storm Sewer - Line L Station 1+50 1 116.0 14.1 97 11 5' BFG Storm Sewer - Line L Station 3+50 1 115.7 14.2 97 l2 3' BFG Storm Sewer - Line L Station 3+50 1 116.7 13.7 97 13 1' BFG Storm Sewer - Line L Station 3+50 1 115.1 12.9 96 NUCLEAR GAUGE I.D.: STD. DENSITY COUNT: AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. BFG- Below Final Grade SOILTECH ENGINEER G AND TESTING, INC. ~~ J es M. Perdue onstruction Materials Manager STD. MOISTURE COUNT: 2502 Gravel Drive .Fort Worth. Texas 76118.817.595.0064 telephone .817.589.7279 metro .817.595.0708 fax SOilteCkl