Loading...
Coppell Greens 2-LR 990920SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-20-99 PROJECT: Coppell Greens REPORT NO.: 99-132.142 SPECIFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-03-99 Moisture Content (%): Technician: J Rogers MATERIAL REFERENCE CURVE DATA CURVE TEST MATERIAL DESCRIPTION MAX. DRY DENSITY (pCfl OPTIMUMo MOISTURE (/o) NO. METHOD 1 D-698A Li ht Brown Sand Cla 119.8 11.8 EN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM'D2922, D3017, RESPECTIVELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DRY DEpC~ MOISTURE (%) % OF MAX. DRY DENSITY 1 15i List 8" Water Line -Fallkirk Dr. Block F Lot 1 1 115.6 14.3 96 2 Final 8" Water Line -Fallkirk Dr. Block F Lot 1 1 114.9 14.5 96 3 15' List 8" Water Line -Mullraney Dr. Block F Lot 2 1 115.8 14.0 97 4 Final 8" Water Line - Mullrane Dr. Block F Lot 2 1 117.1 13.1 98 5 151 List 8" Water Line -Mullraney Dr. Block F Lot 4 1 116.5 13.0 97 6 Final 8" Water Line -Mullraney Dr. Block F Lot 4 1 116.0 13.4 97 7 158 List 8" Water Line -Mullraney Dr. Block F Lot 6 1 115.2 14.2 96 8 Final 8" Water Line -Mullraney Dr. Block F Lot 6 1 117.9 12.8 98 9 1s1 List 8" Water Line -Mullraney Dr. Block F Lot 10 1 116.3 13.5 97 10 Final 8" Water Line -Mullraney Dr. Block F Lot 10 1 118.1 12.5 99 NUCLEAR GAUGE I.D.: STD. DENSITY COUNT: AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. " BFG -Below Final Grade" SOI ECH EN6l~TERII~C~AND ESTING, INC. James M. Perdue Construction Materials Manager STD. MOISTURE COUNT: 2502 Gravel Drive .Fort Worth, Texas 76118.817.595.0064 telephone • 817.589.7279 metro • 817.595.0708 fax so~ttech SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-20-99 PROJECT: Coppell Greens REPORT NO.: 99-132.141 SPECIFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-15-99 Moisture Content (%): Technician: R Burtsell MATERWL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION MAX. DRY DENSITY (pct) OPTIMUM° MOISTURE (/o) 1 D-698 Li ht Brown Sand Cla 119.8 11.8 fN-PLACE TE5T RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DENSITY (p~>7 MOISTURE (/°) % OF MAX. DRY DENSITY 1 15' Lift 1"Water Service Fall Kirk Dr - Block C Lot 54 1 113.9 12.8 95 2 Final 1" Water Service Fall Kirk Dr - Block C Lot 56 1 115.2 13.1 96 3 151 Lift 1" Water Service Fall Kirk Dr - Block C Lot 57 1 116.8 13.2 97 4 Final 1"Water Service Fall Kirk Dr - Block C Lot 58 1 115.6 11.9 96 5 151 Lift 1" Water Service Mullrany Dr - Block C Lot 60 1 118.7 11.8 99 6 Final 1"Water Service Mullrany Dr - Block C Lot 61 1 114.6 12.1 96 7 151 Lift 1"Water Service Mullrany Dr - Block C Lot 60 1 113.9 12.4 95 8 Final 1" Water Service Mullrany Dr - Block C Lot 61 1 114.2 11.6 95 9 15f Lift 1" Water Service Mullrany Dr - Block C Lot 65 1 114.9 11.9 96 10 Final 1"Water Service Mullrany Dr - Block C Lot 64 1 117.8 12.5 98 11 15i Lift 1"Water Service Mullrany Dr - Block C Lot 66 1 117.4 13.0 98 12 151 Lift 1"Water Service Mullrany Dr - Block C Lot 67 1 116.2 13.2 97 13 Final 1" Water Service Mullrany Dr - Block C Lot 68 1 118.1 13.0 99 14 15S Lift 1" Water Service Pullrany Dr - Block C Lot 69 ^, 119.G 12.0 99 15 Final 1" Water Service Lairds Dr - Block C Lot 74 1 116.2 11.9 97 16 15' Lift 1" Water Service Lairds Dr - Block C Lot 75 1 117.3 12.0 98 17 Final 1" Water Service Lairds Dr - Block C Lot 76 1 115.6 12.2 96 18 15' Lift 1"Water Service Lairds Dr - Block C Lot 77 1 114.9 12.8 96 19 Final 1"Water Service Lairds Dr - Block C Lot 78 1 116.8 11.2 97 20 15' Lift 1"Water Service Lairds Dr - Block C Lot 79 1 117.2 11.9 98 21 Final 1" Water Service Lairds Dr - Block A Lot 51 1 118.1 12.0 99 22 15S Lift 1" Water Service Lairds Dr - Block A Lot 50 1 115.2 13.0 96 23 Final 1" Water Service Lairds Dr - Block A Lot 49 1 116.8 11.8 97 24 15S Lift 1"Water Service Lairds Dr - Block A Lot 48 1 117.2 11.2 98 2502 Gravel Drive • Fcrt Worth. Texas 761 ? 8.817.595.0064 telephone • 817.589.7279 metro • 817.595.0708 fax Page 2 99-132.141 25 Final 1 "Water Service Lairds Dr - Block A Lot 47 1 119.0 12.4 99 26 1'' Lift 1" Water Service Lairds Dr - Block A Lot 46 1 117.2 11.9 98 NUCLEAR GAUGE I.D.: 6161 STD. DENSITY COUNT: 2469 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. SOILT CH ENGINE,E/]RIN ND TESTING, INC. ~~~ ~" ( -~-'~ s M. Perdue Construction Materials Manager STD. MOISTURE COUNT: 482 2502 Gravel Drive .Fort Worth, Texas 76118.817.595.0064 telephone .817.589.7279 metro .817.595.0708 fax Soiltech SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-20-99 PROJECT: Coppell Greens REPORT NO.: 99-132.140 SPECIFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-09-99 Moisture Content (%): Technician: R Burtsell MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION MAX. DRY DENSITY (pcf) OPTIMUM° MOISTURE (/o) 1 D-698 Light Brawn Sandy Clay 119.8 71.8 fN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DRY DENSITY (pcf) MOISTURE (%) % OF MAX. DRY DENSITY 1 1" Lift 8" Water Line Kilbridge Court - Block E Lot 35 1 114.8 10.4 96 2 2"d Lift 8" Water Line Kilbridge Court - Block E Lot 33 1 115.8 12.1 96 3 3rd Lift 8" Water Line Kilbridge Court - Block E Lot 31 1 116.5 12.4 97 4 Final 8" Water Line Kilbrid e Court - Block E Lot 30 1 117.2 12.0 98 5 15` Lift 8" Water Line Kilbridge Court - Block E Lot 19 1 115.9 11.9 97 6 Final 8" Water Line Kilbridge Ct. -Block A btwn. Lots 45 & 46 1 116.2 12.6 97 NUCLEAR GAUGE I.D.: 6161 STD. DENSITY COUNT: 2510 STD. MOISTURE COUNT: 496 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. SOI TECH EN INEERI AND TESTING, INC. ~!'rl James M. Perdue Construction Materials Manager 2502 Gravel Drive .Fort Worth, Texas 76118.817.595.0064 telephone .817.589.7279 metro • 817.595.0708 fax soiltech SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-20-99 PROJECT: Coppell Greens REPORT NO.: 99-132.139 SPECIFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-10-99 Moisture Content (%): Technician: R Burtsell MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION MAX. DRY DENSITY (pCt7 OPTIMUM° MOISTURE (/o) 1 D-698 Light Brown Sandy Clay 119.8 11.8 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPEGTk1fELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DENSITI' (F~ MOISTURE (%) % OF MAX. DRY DENSITY 1 15c Lift Kilbridge Court - Block E -Lot 30 1 115.2 10.2 96 2 2nd Lift Kilbridge Court - Block E -Lot 28 1 116.8 12.8 97 3 Final Center Line - Cul de Sac 1 115.9 12.6 97 4 15f Lift Dalmall Lane - Block E Lot 9 1 117.2 11.9 98 5 2"d Lift Dalmally Lane - Block E Lot 11 1 115.9 11.2 97 6 Final Dalmally Lane - Block E Lot 13 1 116.2 12.1 97 7 151 Lift Dalmally Lane - Block E Lot 15 1 117.5 12.4 98 NUCLEAR GAUGE I.D.: 6161 STD. DENSITY COUNT: 2415 STD. MOISTURE COUNT: 468 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. "INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. SOILT CH ENGINEERIN ND TESTING, INC. C? %, James M. Perdue Construction Materials Manager soiltech SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-20-99 PROJECT: Coppell Greens REPORT NO.: 99-132.138 SPECIFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-01-99 Moisture Content (%): Technician: R Burtsell MATERIAL REFERENCE CURVE DATA CURVE NO. TEST METHOD MATERIAL DESCRIPTION MAX. DRY DENSITY (pcf) OPTIMUM° MOISTURE (/o) 1 D-698 Li ht Brown Sand Cla 119.8 11.8 IN-PLACETE5T RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DENSITY (F~ MOI STURE (/°) % OF MAX. DRY DENSITY 1 3' BFG 4" Sanitary Sewer Service - Block E Lot 8 1 115.4 12.9 96 2 1' BFG 4" Sanitary Sewer Service - Block E Lot 8 1 119.6 12.0 100 3 3' BFG 4" Sanitary Sewer Service - Block E Lot 9 1 114.7 13.6 96 4 1' BFG 4" Sanita Sewer Service - Block E Lot 9 1 116.5 13.1 97 5 3' BFG 4" Sanitary Sewer Service - Block E Lot 10 1 114.3 13.8 95 6 1' BFG 4" Sanitary Sewer Service - Block E Lot 10 1 117.1 12.5 98 7 3' BFG 4" Sanitary Sewer Service - Block E Lot 11 1 116.0 12.9 97 8 1' BFG 4" Sanitary Sewer Service - Block E Lot 11 1 115.3 13.0 96 9 3' BFG 4" Sanitary Sewer Service - Block E Lot 12 1 117.9 12.1 98 10 1' BFG 4" Sanitary Sewer Service - Block E Lot 12 1 118.8 12.4 99 11 3' BFG 4" Sanitary Sewer Service - Block E Lot 13 1 119.0 11.9 99 12 1' BFG 4" Sanitary Sewer Service - Block E Lot 13 1 117.2 11.9 98 13 3' BFG 4" Sanitary Sewer Service - Block E Lot 14 1 115.4 12.9 96 14 1' BFG 4" Sanitary Sewer Service - Block E Lot 14 1 117.8 13.0 98 NUCLEAR GAUGE I.D.: 6161 STD. DENSITY COUNT: 2469 STD. MOISTURE COUNT: 482 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. * INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. " BFG -Below Final Grade" SOILT CH ENG I~EERIN ND TESTING, INC. J es M. Perdue Construction Materials Manager SOIL MOISTURE -DENSITY TEST REPORT IN -PLACE TESTS BY NUCLEAR METHODS CLIENT: Argus Development REPORT DATE: 09-20-99 PROJECT: Coppetl Greens REPORT NO.: 99-132.134 S'PECiFICATIONS TEST DATA Percent Compaction: 95 % Date Tested: 09-16-99 Moisture Content (%): Technician: R Burtsell MATERIAL REFERENCE CURVE DATA CURVE TEST MATERIAL DESCRIPTION MAX. DRY OPTIMUM NO. METHOD DENSITY (pct) ° MOISTURE (/o) 1 D-698 Li ht Brown Sand Cla 119.8 11.8 IN-PLACE TEST RESULTS DENSITY AND MOISTURE TESTS ARE PER ASTM D2922, D3017, RESPECTIVELY TEST NO. LIFT OR ELEVATION LOCATION REF. CURVE DENSITY (P~ MOISTURE (%) % OF MAX. DRY DENSITY 1 15` Lift 1" Water Service Kilbridge Lane - Block A Lot 30 1 115.2 11.2 96 2 Final 1"Water Service Kilbridge Lane - Block A Lot 31 1 116.8 11.8 97 3 15' Lift 1"Water Service Kilbridge Lane - Block A Lot 32 1 115.9 12.1 97 4 Final 1" Water Service Kilbrid a Lane - Block A Lot 33 1 118.0 12.0 98 5 151 Lift 1"Water Service Kilbridge Lane - Block A Lot 34 1 117.6 11.9 98 6 Final 1"Water Service Kilbridge Lane - Block A Lot 35 1 116.8 11.7 97 7 15` Lift 1"Water Service Kilbridge Lane - Block A Lot 36 1 118.1 12.2 99 "8 Final 1" Water Service Kilbridge Lane - Block A Lot 37 1 115.4 11.0 96 9 15` Lift 1"Water Service Kilbridge Lane - Block A Lot 38 1 116.3 11.1 97 10 Final 1" Water Service Kilbridge Lane - Block A Lot 39 1 115.8 11.6 97 11 15' Lift 1" Water Service Kilbridge Lane - Block A Lot 40 1 115.7 12.0 97 12 Final 1" Water Service Kilbridge Lane - Block A Lot 41 1 117.2 11.9 98 13 15` Lift 1" Water Service Kilbridge Lane - Block A Lot 42 1 118.1 12.7 99 i4 Finai i"Water Service Kilbridge Lane - Block A Lot 43 1 116.5 11.6 97 15 151 Lift 1"Water Service Kilbridge Lane - Block A Lot 44 1 119.0 11.9 99 16 Final 1" Water Service Kilbridge Lane - Block A Lot 45 1 117.2 12.2 98 17 151 Lift 1" Water Service Kilbridge Court - Block E Lot 25 1 118.1 11.9 99 19 15` Lift 1" Water Service Kilbridge Court - Block E Lot 23 1 116.9 12.2 98 20 Final 1" Water Service Kilbridge Court - Block E Lot 24 1 116.8 12.1 97 21 15` Lift 1" Water Service Kilbridge Court - Block E Lot 21 1 118.6 12.1 99 22 Final 1"Water Service Kilbridge Court - Block E Lot 22 1 115.4 11.6 96 23 151 Lift 1"Water Service Dalmalley Lane - Block F Lot 21 1 116.1 11.8 97 24 Final 1" Water Service Dalmalley Lane - Block F Lot 22 1 116.8 12.2 97 Page 2 99-132.134 ZS 15f Lift 1 "Water Service Dalmalley Lane - Block F Lot 19 1 117.1 12.3 98 26 Final 1" Water Service Dalmalley Lane - Block F Lot 20 1 115.6 10.9 96 27 1 g' Lift 1"Water Service Dalmalley Lane - Block F Lot 17 1 116.2 11.3 97 28 Final 1" Water Service Dalmalley Lane - Block F Lot 18 1 115.0 11.2 96 29 15f Lift 1" Water Service Dalmalley Lane - Block F Lot 16 1 117.2 12.0 98 30 Final 1" Water Service Dalmalley Lane - Block F Lot 16 1 116.8 12.1 97 NUCLEAR GAUGE I.D.: 6161 STD. DENSITY COUNT: 2486 STD. MOISTURE COUNT: 485 AN "R" AFTER THE TEST NUMBER INDICATE RETEST. INDICATES FAILURE TO COMPLY WITH PROJECT SPECIFICATIONS. SOIL ECH ENGINEERIN~AND TESTING, INC. ~~ /-~~~~ es M. Perdue Construction Materials Manager