Loading...
CF-Justice Center-LR060913 In-Place Soil Moisture/Density Tests by Nuclear Method eM J ENGINEERING, INC. 7636 Pebble Drive Fort Worth, Texas 76118 Tel: (817) 284-9400 Fax: (817) 589-9993 Client: Project: Harrison, Walker, & Harper Police and Fire Renovation City of Coppell Report Distribution: (1) Harrison, Walker, & Harper (1) City of Coppell (1) Brinkley Sargent Architects (1) Structural Engenuity (1) Teague, Nail, & Perkins CMJ Report No.: 875-6111-010 Report Date: 09/13/2006 Specifications Percent Compaction: +95% min Moisture Content: opt +0% to +4% Test Data Date Tested: 09/08/2006 Technician: Joshua Davis Curve No. Test Method Material Description Optimum Maximum Dry Moisture % Density pet 2777 ASTM 0-698 Dark Brown and Gray Clay 20.5 99.0 In-Place Test Results Ref. Probe Percent Wet Density Dry Density Percent CUlve Depth Moisture (pet) (pct) Density 2777 6" 23.9 122.4 98.8 99.8 2777 6" 24.2 118.1 95.1 96.1 2777 6" 23.9 122.0 98.5 99.5 2777 6" 22.9 117.1 95.3 96.3 Test Elevation No or Lift Location Trench Backfill** 15.0 -6.0" 6" Fire, Water line B, Sta. 0+75 16.0 -1.5' 6" Fire, Water line B, Sta. 0+75 17.0 -6.0" 4" Dom, Water line A, Sta. 0+75 18.0 -1.5' 4" Dom, Water line A. Sta. 0+75 Test results on this report meet project specification. Test Method(s): ASTM D2922, ASTM D3017 Additional Remark(s): **NEW WATER LINES ON SOUTH END OF POLICE ADDITION CMJ Engineering, Inc Gauge: Humboldt Gauge SN: 5368 LIMITATIONS: The test results presented in this report apply only to the specific samples, ite s, nd areas described within this report. The test results do not pertain to any other samples, items or areas regardless of similarity. Our reports are pr ced solely for the exclusive use of our client. This report or any portion of this report may not be reproduced without the written conse t of our client and CMJ Engineering, Inc. 07 Page 1 of I