Coppell/121 Off Pk-CS061024October 24, 2006
Tom Wouters
Realty Capital
99 Main Street, Suite 200
Colleyville TX 76034
RE: Coppel]i121 Office Park, I.ot 2R, Block 1 (Parking Expansion)
Final Acceptance
Dear Mr. Wouters:
Representatives of the City of Coppell have confirmed a final inspection of paving and utilities
for the referenced project. The two-year maintenance bonds and as-built drawings have been
received. Maturity on the bonds will he two years from the date of this letter.
~'ou may notifi~ the MS4 (City of Coppell) at an}° time during the two-year maintenance period if
stabilization of the site per the SW'PPP permit can be demonstrated. If so. complete and submit a
Notice of Termination (NOT) to discontinue co~~erage under the SWPPP permit.
-~ follo«-up inspection of the facilities ~~ilf he conducted prior to the lapse of the two-year bond
period. If any punchlist items are noted at that time, you ~~-ill he contacted to make repairs. Thanks
for ~uur cooperation.
Sincerely,
,.,,
-.
x .; ;-
Rick O'Dell
Construction inspector
Office Phone: (972) 304-7090
}=ax: (972) 304-3570
cc: Ken Griffin, P.E.. Director of IJ~ngineering & Public Worla
Glenn Ilollo~~~ell, P.E.. Asst. Director of Public Works
Greg Jones, Chief Building Official
Tim Oates, Fire Marshal
Keiih Marvin, P.E.
Assistant City Engineer