Deer Run-LR000223CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL
LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
SPECIFIED COMPRESSIVE
STRENGTH
(psi)
DRC 21
7
02/22/00
90000
3180
4000/28 days
DRC 22
28
03/14/00
DRC 23
28
03/14/00
DRC 24
Hold
Specifications:
Making ASTM C -31
Curing:
Testing ASTM C -143,
Methods: ASTM C -39
Fracture mode
Types of
Fracture: A
is (A) unless otherwise noted
l T rJ
B C L_ D_
FUGRO SOUTH, INC.
REMARKS:
SMH /rm
Distribution:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Ryland Homes
PROJECT: Deer Run, Coppell, Texas
SAMPLE DATE: February 15, 2000
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. °F):
CONCRETE TEMP. °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Technician: Dumitru Balas
Ryland Homes Philip Flink
City of Coppell Garth Campbell
Gilco Mark Leonard
Gilco Contracting Co.
441094 CONCRETE SUPPLIER:
70 PLANT/TRUCK:
65 MIX ID NUMBER:
11:00 AIR (ASTM C 231)
11:35 WATER ADDED (gal):
Sunny SLUMP (in.) (ASTM C 143)
Paving: On Alley C2, station 2 +25
FUGRO SOUTH INC.
Reviewed By: Tf
Pioneer Concrete
27/823
7724
4.5
15
7.50
REPORT DATE: February 23, 2000
PROJECT NO: 0791 -2308
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 28.27 square inches
CYLINDER
NUMBER
AGE
(days)
DATE
TESTED
TOTAL
LOAD
(pounds)
COMPRESSIVE
STRENGTH
(psi)
SPECIFIED COMPRESSIVE
STRENGTH
(psi)
DRC 17
7
02/22/00
106000
3750
4000/28 days
DRC 18
28
03/14/00
DRC 19
28
03/14/00
DRC 20
Hold
Specifications:
Making ASTM C -31
Curing:
Testing ASTM C -143,
Methods: ASTM C -39
Fracture mode
Types of
Fracture: A
is (A) unless otherwise noted
g C D
FUGRO SOUTH, INC.
REMARKS
SMH /rm
Distribution:
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Ryland Homes
PROJECT: Deer Run, Coppell, Texas
SAMPLE DATE: February 15, 2000
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. °F):
CONCRETE TEMP. °F) (ASTM
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Technician: Dumitru Balas
Gilco Contracting Co.
441069 CONCRETE SUPPLIER:
48 PLANT/TRUCK:
C 1064): 60 MIX ID NUMBER:
6:35 am AIR (ASTM C 231)
7:15 am WATER ADDED (gal):
Clear SLUMP (in.) (ASTM C 143)
Paving on Alley B2, station 1 +10
Ryland Homes Philip Flink
City of Coppell Garth Campbell
Gilco Mark Leonard
FUGRO SOUTH INC.
Reviewed By:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301: Fax (972) 620 -7328
REPORT DATE: February 23, 2000
PROJECT NO: 0791 -2308
Pioneer Concrete
27/924
7724
5.4
0
3