Loading...
Deer Run-LR000223CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) SPECIFIED COMPRESSIVE STRENGTH (psi) DRC 21 7 02/22/00 90000 3180 4000/28 days DRC 22 28 03/14/00 DRC 23 28 03/14/00 DRC 24 Hold Specifications: Making ASTM C -31 Curing: Testing ASTM C -143, Methods: ASTM C -39 Fracture mode Types of Fracture: A is (A) unless otherwise noted l T rJ B C L_ D_ FUGRO SOUTH, INC. REMARKS: SMH /rm Distribution: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Ryland Homes PROJECT: Deer Run, Coppell, Texas SAMPLE DATE: February 15, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. °F): CONCRETE TEMP. °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Technician: Dumitru Balas Ryland Homes Philip Flink City of Coppell Garth Campbell Gilco Mark Leonard Gilco Contracting Co. 441094 CONCRETE SUPPLIER: 70 PLANT/TRUCK: 65 MIX ID NUMBER: 11:00 AIR (ASTM C 231) 11:35 WATER ADDED (gal): Sunny SLUMP (in.) (ASTM C 143) Paving: On Alley C2, station 2 +25 FUGRO SOUTH INC. Reviewed By: Tf Pioneer Concrete 27/823 7724 4.5 15 7.50 REPORT DATE: February 23, 2000 PROJECT NO: 0791 -2308 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 28.27 square inches CYLINDER NUMBER AGE (days) DATE TESTED TOTAL LOAD (pounds) COMPRESSIVE STRENGTH (psi) SPECIFIED COMPRESSIVE STRENGTH (psi) DRC 17 7 02/22/00 106000 3750 4000/28 days DRC 18 28 03/14/00 DRC 19 28 03/14/00 DRC 20 Hold Specifications: Making ASTM C -31 Curing: Testing ASTM C -143, Methods: ASTM C -39 Fracture mode Types of Fracture: A is (A) unless otherwise noted g C D FUGRO SOUTH, INC. REMARKS SMH /rm Distribution: COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Ryland Homes PROJECT: Deer Run, Coppell, Texas SAMPLE DATE: February 15, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. °F): CONCRETE TEMP. °F) (ASTM TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Technician: Dumitru Balas Gilco Contracting Co. 441069 CONCRETE SUPPLIER: 48 PLANT/TRUCK: C 1064): 60 MIX ID NUMBER: 6:35 am AIR (ASTM C 231) 7:15 am WATER ADDED (gal): Clear SLUMP (in.) (ASTM C 143) Paving on Alley B2, station 1 +10 Ryland Homes Philip Flink City of Coppell Garth Campbell Gilco Mark Leonard FUGRO SOUTH INC. Reviewed By: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301: Fax (972) 620 -7328 REPORT DATE: February 23, 2000 PROJECT NO: 0791 -2308 Pioneer Concrete 27/924 7724 5.4 0 3