Loading...
Gateway BP(2.5)-LR 9812011LL11WG1 i.,. CONCRETE SUPPLIER TICKET NUMBER TIME TRUCK DISPATCHED TIME TRUCK UNLOADED YARDS OF CONCRETE SLUMP, IN AIR CONTENT, TEMPERATURE: °F AIR 60 CONCRETE 70 7062329 04:38 am 05:15 am 100.0 6 2.0 7062340 05:37 am 06:00 am 210.0 5 3.0 62 70 7062353 06:56 am 07:20 am 330.0 5 1/2 2.5 68 74 6085535 08:45 am 09:25 am 380.0 5 2.0 68 74 TESTED FOR: DATE: FIELD DATA: SET NO. 1055 1056 1057 1058 LOCATION: 1055 1056 1057 1058 PSI A-200-1 (3)F Engineering Consulting Testing ALAN GRIMES PROJECT: G K LAUNDRY PROCESSING ROGERS O'BRIEN CONSTRUCTION 11145 MORRISON LANE DALLAS, TX 75229 December 01, 1998 Concrete was a 4000 psi mix mix NO. OF SPECIMENS MADE 4 4 4 4 PAVEMENT, 150' EAST 480' EAST 870' EAST 480' EAST 270' TECHNICIAN: M. HERNANDEZ REPORT OF FIELD INSPECTION OF CONCRETE OUR REPORT NO.: 337 80080 -46 delivered by LATTIMORE, END OF BUILDING AND 150' NORTH FROM NORTHWEST CORNER OF BUILDING 180' NORTH FROM NORTHWEST CORNER OF BUILDING 120' NORTH FROM NORTHWEST CORNER OF BUILDING NORTH FROM NORTHWEST CORNER OF BUILDING 1 NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31 -96; SLUMP: C143-90a; AIR CONTENT: C231 -97; TEMPERATURE: C1064- 86(93) REMARKS: Observed the placement of 400.0 cubic yards of concrete. cc: (1) ROGERS O'BRIEN (1) HALFF ASSOCIATES, INC. ,/(1) CITY OF COPPELL Attn:GARRETH CAMPBELL THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT. REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC. Professional Service Industries, Inc. 2556 Gravel Drive Fort Worth, TX 76118 Phone 817/284 -3783 Fax 817/284 -8942 Respectfully submitted, Professional Service Industries, Inc.