Gateway BP(2.5)-LR 9812011LL11WG1 i.,.
CONCRETE
SUPPLIER
TICKET NUMBER
TIME TRUCK
DISPATCHED
TIME TRUCK
UNLOADED
YARDS OF
CONCRETE
SLUMP, IN
AIR
CONTENT,
TEMPERATURE: °F
AIR
60
CONCRETE
70
7062329
04:38 am
05:15 am
100.0
6
2.0
7062340
05:37 am
06:00 am
210.0
5
3.0
62
70
7062353
06:56 am
07:20 am
330.0
5 1/2
2.5
68
74
6085535
08:45 am
09:25 am
380.0
5
2.0
68
74
TESTED FOR:
DATE:
FIELD DATA:
SET NO.
1055
1056
1057
1058
LOCATION:
1055
1056
1057
1058
PSI A-200-1 (3)F
Engineering Consulting Testing
ALAN GRIMES PROJECT: G K LAUNDRY PROCESSING
ROGERS O'BRIEN CONSTRUCTION
11145 MORRISON LANE
DALLAS, TX 75229
December 01, 1998
Concrete was a 4000 psi mix
mix
NO. OF
SPECIMENS
MADE
4
4
4
4
PAVEMENT,
150' EAST
480' EAST
870' EAST
480' EAST 270'
TECHNICIAN: M. HERNANDEZ
REPORT OF FIELD INSPECTION OF CONCRETE
OUR REPORT NO.: 337 80080 -46
delivered by LATTIMORE,
END OF BUILDING
AND 150' NORTH FROM NORTHWEST CORNER OF BUILDING
180' NORTH FROM NORTHWEST CORNER OF BUILDING
120' NORTH FROM NORTHWEST CORNER OF BUILDING
NORTH FROM NORTHWEST CORNER OF BUILDING
1
NOTE: APPLICABLE ASTM STANDARDS, UNLESS OTHERWISE INDICATED: MAKING TEST SPECIMENS: C31 -96; SLUMP: C143-90a; AIR CONTENT: C231 -97; TEMPERATURE: C1064- 86(93)
REMARKS: Observed the placement of 400.0 cubic yards of concrete.
cc: (1) ROGERS O'BRIEN (1) HALFF ASSOCIATES, INC.
,/(1) CITY OF COPPELL Attn:GARRETH CAMPBELL
THESE TEST RESULTS APPLY ONLY TO THE SPECIFIC SAMPLES TESTED AND MAY NOT BE INDICATIVE OF THE ENTIRE CONCRETE PLACEMENT.
REPORTS MAY NOT BE REPRODUCED, EXCEPT IN FULL. WITHOUT WRITTEN PERMISSION BY PROFESSIONAL SERVICE INDUSTRIES, INC.
Professional Service Industries, Inc. 2556 Gravel Drive Fort Worth, TX 76118 Phone 817/284 -3783 Fax 817/284 -8942
Respectfully submitted,
Professional Service Industries, Inc.