Old Townhomes-CS040817Rug 17 04 01:07p
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Garreth Campbell, Construction Inspector, Engineering
From: Cody Wildoner, Streets Division Public Works
Date: August 17, 2004
RE: Walk-thru Old Coppell Townhomes
Paving
1. Rework throat on south side of McNear.
2. Seal sa~,wcuts in curb on McNear.
3. Clean out RCP at creek.
4. -Sear-ep-irrlet curb return on all uilets.
5, Install buttons at median at McNear.
p.l
C/TY OFCOPPELL PUBLIC WORKSDEPARTMENT