Loading...
Old Townhomes-CS040817Rug 17 04 01:07p MEMORANDUM FROM THE DEPARTMENT OF PUBLIC WORKS To: Garreth Campbell, Construction Inspector, Engineering From: Cody Wildoner, Streets Division Public Works Date: August 17, 2004 RE: Walk-thru Old Coppell Townhomes Paving 1. Rework throat on south side of McNear. 2. Seal sa~,wcuts in curb on McNear. 3. Clean out RCP at creek. 4. -Sear-ep-irrlet curb return on all uilets. 5, Install buttons at median at McNear. p.l C/TY OFCOPPELL PUBLIC WORKSDEPARTMENT