Loading...
SC-Coppell MSW-CS010808. I I A August 8 2001 Robert Howman t(l. ' � t'p � � ,�k w^ Glenn Engineering 0 1L1 100 Decker Ct, Suite 250 Irving, TX 75062 -2206 RE: Coppell Middle School West 2001 Additions, Renovations & Service Center Construction Plan Review Continents Dear Robert: The City of Coppell has reviewed the referenced plans and has the following comments to offer: Service Center Plans - 1. All details should be in compliance with City of Coppell Standard Details. Any details included in plans that are also within our Standard Details should be removed. Please be advised that during the course of construction, the City will enforce our Standard Details, regardless of what details are shown within the plans. 2. The most recent plat should be provided with the construction plans. 3. Sheet C2.7 — the proposed 5' flume should be discharged into the existing drainage way at an angle as opposed to 90 °. 4. Sheet C2.9 — there is a comment to relocate a pond. The relocation appears to be on top of an 8" water line. Is this note an error, or is there actually going to be a pond built at this location? 5. Show all existing proposed easements. 6. Sheet C2.10 — provide all hydraulic information for line A. 7. Sheet C2.12 — as previously stated, please remove details contained within City of Coppell Standard Details, as we will enforce our Standard Details. 8. Sheet C2.14 — several of the notes are written on top of other notes making them difficult to read, please revise. 9. It appears as though the proposed 8" water line around the new Service Center is to be constructed as a fire line only. To be a fire line only and not contained within any easement, you do need to provide vaults as it connects to the existing 8" water line. If it is proposed to be public, then an easement should be shown on the proposed plat. Also, if it is to be public, it should be extended to your southern property line so that the property south of the school can tie onto it in the future. 10. When the constant changing on this school site between buildings, fields, irrigation and fire protection, etc. there should be consideration given to making the entire water system private. 255 PARKWAY * P.O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 9721304 3673 This can be easily accomplished by providing a vault and a high/low compound meter on the two 8" water lines that connect to the 12" water line in Wrangler Dr. By making this modification, all the interior water lines, irrigation lines, etc. would then be private. This would eliminate the need for all the meters onsite to the various buildings and irrigation systems. It would also eliminate the need for the double check and vault for the fire lines going to the buildings. Once you have evaluated this comment, please contact this office to discuss options further. 11. A valve should be installed on the relocated portion of the existing 8" water line, which will allow portions of the existing line to be isolated for repair or maintenance while still providing fire protection to the sprinkler system for the Service Center and water to hydrants around the Service Center. 12. Need to provide a Fire Department connection for the Service Center. 13. All water lines crossing either existing or proposed sewer lines should be constructed per TNRCC rules. This may require encasing either the water or the sewer line depending on the situation. Coppell Middle School West 2001 Addition/Renovations — 1. Need to include the correct plat. 2. Sheet C2.9 - our plans show the existing 8" water line to be located beneath the new proposed drive approach on the west side of the parking lot. This may require relocating the existing water valve. 3. Sheet C2.1 — the proposed meter for the new concession should be relocated closer to the main line, and included within either the existing easement or a new easement before the plat is filed. Again, all crossing of existing with proposed water and sewer lines should be as per TNRCC rules. Once all changes have been made, please resubmit these marked -up plans and two sets of revised plans to the City for review. If you have any questions, please contact me at (972) 304- 3686. Sincerely, k 7 Kenneth M. Griffin, P.E. Director of Engineering & Public Works