Loading...
SC-Coppell MSW-LR020510FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT: Coppell ISD Service Center, Coppell, Texas Report Date May 10, 2002 Project No.: 0701 -2233 SAMPLE DATE: April 10, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 106562 CONCRETE SUPPLIER: Hanson 66 PLANTITRUCK: 22/1095 70 MIX ID NUMBER: 9351 8:35 AIR ( %) (ASTM C -231) : 4.3 9:10 WATER ADDED (gal): NUMBER Cloudy SLUMP (in.) (ASTM C -143) : 5 Transformer pad on south side of building (psi) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE (pounds) STRENGTH STRENGTH NUMBER (days) TESTED (psi) (psi) CSC 225 7 4/17/02 90700 3210 3600/28 days CSC 226 28 5/8/02 119000 1 4210 CSC 227 28 5/8/02 116800 4130 CSC 228 Hold Fracture mode is (A) unless otherwise noted Specifications: & ASTM C-31 ® Curing Methods: ASTM C -39 Fracture: A B ® C D REMARKS: Technician James Spriggs FUGRO SOUTH INC. Reviewed By: �• �.�- SMH /sv /rm Distribution K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl