Loading...
SC-Coppell MSW-LR020412FUGRO SOUTH, INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE April 12, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas PROJECT NO 0701 -2233 DATE PERFORMED: April 10, 2002 General Contractor: CISD Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Tronsformer pad on southside of building Time placement began: 9:05 a.m. Time placement ended: 9:40 a.m. Total cubic yards placed: 10 Slump range (inches): 5 to 5 Slump required (inches): 5 Concrete supplier and plant: Hanson Concrete temperature range ( °F): 70 to 70 °F Strength required (psi /days): 3600/28 Number of cylinders made: 4 Superplasticizer used: No James Spriggs Fugro South Technician FUGRO SOUTH, INC. Plant # 22 Reviewed By: G c SMH /nl Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone �- City of Coppell - Garreth Campbell - Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl