Loading...
SC-Coppell MSW-LR020408FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: April 8, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233 SAMPLE DATE: March 8, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 119704 CONCRETE SUPPLIER: Hanson 62 PLANTITRUCK: 27/923 67 MIX ID NUMBER: 9351 3:45 a.m. AIR ( %) (ASTM C -231) : - 4:15 a.m. WATER ADDED (gal): - Cloudy SLUMP (in.) (ASTM C -143) : 6 -3/4 Paving on parking lot and firelane on southeast side of service center building, 105 feet west and 30 feet south from southeast corner of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE (pounds) STRENGTH STRENGTH NUMBER (days) TESTED (psi) (psi) CSC 193 7 03/15/02 81100 2870 3600/28 days CSC 194 28 04/05/02 112300 3970 CSC 195 28 04/05/02 110500 3910 CSC 196 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. Reviewed By: SMH /bg /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. Clan ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: April 8, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233 SAMPLE DATE: March 8, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 040726 CONCRETE SUPPLIER: Hanson 65 PLANT/TRUCK: 22/108 68 MIX ID NUMBER: 9351 8:45 a.m. AIR ( %) (ASTM C -231) : - 9:20 a.m. WATER ADDED (gal): - Cloudy SLUMP (in.) (ASTM C-143): 6 -3/4 Paving on parking lot and firelane on northeast side of service center building, 75 feet east and 100 feet north from northeast corner of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE (pounds) STRENGTH STRENGTH NUMBER (days) TESTED (psi) (psi) CSC 209 7 03/15/02 92800 3280 3600/28 days CSC 210 28 04/05/02 114600 4050 CSC 211 28 04/05/02 117000 4140 CSC 212 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143. Types of Curing: Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. Reviewed By: SMH /bg /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. �faRO i ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date April 8, 2002 PROJECT Coppell ISD Service Center, Coppell, Texas Project No .: 0701 -2233 SAMPLE DATE: March 8, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Goup 119732 CONCRETE SUPPLIER: Hanson 63 PLANT/TRUCK: 27/648 71 MIX ID NUMBER: 9351 6:37 a.m. AIR ( % ) (ASTM C -231) : - 7:40 a.m. WATER ADDED (gal): 10 Cloudy SLUMP (in.) (ASTM C -143) : 5 -1/2 Paving on parking lot and firelane on southeast side of service center building, 75 feet east and 30 feet north from southeast corner of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE (pounds) STRENGTH STRENGTH NUMBER (days) TESTED (psi) (psi) CSC 205 7 03/15/02 100600 3560 3600128 days CSC 206 28 1 04/05/02 120700 4270 CSC 207 28 04/05/02 122500 4330 CSC 208 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: Methods: ASTM C -39 Fracture: A B C D REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. Reviewed By: S M H /bg /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 -462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. As own 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: April 8, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233 SAMPLE DATE: March 8, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Goup 119724 CONCRETE SUPPLIER: Hanson 63 PLANTITRUCK: 27/648 67 MIX ID NUMBER: 9351 5:45 a.m. AIR ( %) (ASTM C -231) : - 6:10 a.m. WATER ADDED (gal): 10 Cloudy SLUMP (in.) (ASTM C -143) : 6 -1/4 Paving on parking lot and firelane on southeast side of service center building, 35 feet east and 80 feet south from southeast corner of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE (pounds) STRENGTH STRENGTH NUMBER (days) TESTED (psi) (psi) CSC 201 7 03/15/02 97400 3450 3600/28 days CSC 202 28 04/05/02 127100 1 4500 CSC 203 28 04/05/02 125400 4440 CSC 204 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 19 Curing: I Methods: ASTM C -39 Fracture: q n g C D REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. Reviewed By: SMH /bg /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. � f1'sR0 . L ■ 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD Report Date April 8, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas Project No .: 0701 -2233 SAMPLE DATE: March 8, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 119712 CONCRETE SUPPLIER: Hanson 62 PLANTITRUCK: 27/1015 68 MIX ID NUMBER: 9351 4:35 a.m. AIR ( % ) (ASTM C -231) : - 5:10 a.m. WATER ADDED (gal): - Cloudy SLUMP (in.) (ASTM C -143) : 6 -1/2 Paving on parking lot and firelane southeast site of service center building, 35 feet west and 60 feet south from southeast corner of building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL LOAD COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE (pounds) STRENGTH STRENGTH NUMBER (days) TESTED (psi) (psi) CSC 197 7 03/15/02 91300 3230 3600/28 days CSC 198 28 1 04/05/02 117200 4150 CSC 199 28 04/05/02 120300 4260 CSC 200 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of E Z Curing: Methods: ASTM C -39 Fracture: A B C D REMARKS: Technician: Dumitru Balas FUGRO SOUTH INC. Reviewed By: SMH /bg /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl