Loading...
SC-Coppell MSW-LR020315FUGRO SOUTH, INC. COMM Ban 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT: Coppell ISD Service Center, Coppell, Texas Report Date: March 15, 2002 Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 119584 CONCRETE SUPPLIER: Hanson 68 PLANT/TRUCK: 27/2041 61 MIX ID NUMBER: 9351 10:30 AIR ( %) (ASTM C -231) : 5.1 11:10 WATER ADDED (gal): 10 Partly Cloudy SLUMP (in.) (ASTM C -143) : 5 -1/2 South parking lot, 20 feet north by 40 feet east of southwest curb corner of parking lot 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 165 7 03/13/02 92400 3270 4000/28 days CSC 166 28 04/03/02 CSC 167 28 04/03/02 CSC 168 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Z Curing: I Methods: ASTM C -39 Fracture: A® B® C D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By: SMH /bg Ar Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell — Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: March 15, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc. 119580 CONCRETE SUPPLIER: Hanson 56 PLANT/TRUCK: 27/0711 60 MIX ID NUMBER: 9351 10:10 a.m. AIR ( %) (ASTM C -231) : 4.2 10:45 a.m. WATER ADDED (gal): 10 Partly Cloudy SLUMP (in.) (ASTM C -143) : 6.0 South parking lot, approx. 200 feet south of northwest curb corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 161 7 03/13/02 96900 3430 4000/28 days CSC 162 28 04/03/02 CSC 163 28 04/03/02 CSC 164 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Curing: Testing ASTM C -143, Methods: ASTM C Types of Fracture: n Z I -39 A B® C D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. iN son 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT: Coppell ISD Service Center, Coppell, Texas Report Date: March 15, 2002 Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc 119562 CONCRETE SUPPLIER: Hanson 48 PLANT/TRUCK: 27/1806 59 MIX ID NUMBER: 935 8:20 a.m. AIR ( %) (ASTM C -231) : 5.2 8:45 a.m. WATER ADDED (gal): 0 Partly Cloudy SLUMP (in.) (ASTM C -143) : 5.0 South parking lot, 40 feet south x 20 feet east of parking lot curt corner CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 157 7 03/13/02 98700 3491 4000/28 days CSC 158 28 04/03/02 CSC 159 28 04/03/02 CSC 160 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Curing: Testing ASTM C -143, Methods: ASTM C Types of Fracture: Z I -39 A B® C D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. iGnu ■ ■� 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT Coppell ISD Service Center, Coppell, Texas Report Date March 15, 2002 Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc. 119548 CONCRETE SUPPLIER: Hanson 46 PLANT/TRUCK: 27/2041 57 MIX ID NUMBER: 9351 6:50 AIR ( %) (ASTM C -231) : 4.4 7:30 WATER ADDED (gal): 10 Partly Cloudy SLUMP (in.) (ASTM C -143) : 5 -1/2 Approach entering south parking lot on southwest entrance CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 153 7 03/13/02 84800 3000 4000/28 days CSC 154 28 04/03/02 CSC 155 28 04/03/02 CSC 156 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: I Methods: ASTM C -39 Fracture: A B® C Z D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. Biwa 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD Report Date: March 15, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc. 119534 CONCRETE SUPPLIER: Hanson 44 PLANT/TRUCK: 27/1015 56 MIX ID NUMBER: 9351 5:10 AIR ( %) (ASTM C -231) : 5.0 5:45 WATER ADDED (gal): 5.0 Partly Cloudy SLUMP (in.) (ASTM C -143) : 5.0 Approx. 135 feet east of northwest curb at corner of north parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 149 7 03/13/02 107200 3790 4000/28 days CSC 150 28 04/03/02 CSC 151 28 04/03/02 CSC 152 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 0 Curing: I Methods: ASTM C -39 Fracture: A B C D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. � � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD PROJECT Coppell ISD Service Center, Coppell, Texas Report Date: March 15, 2002 Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc. 119528 CONCRETE SUPPLIER: Hanson 44 PLANT/TRUCK: 27/041 56 MIX ID NUMBER: 9351 4:35 AIR ( % ) (ASTM C -231) : 4.2 5:10 WATER ADDED (gal): 10 Partly Cloudy SLUMP (in.) (ASTM C -143) : 5 -1/2 Approach at 50 feet east of northwest curb corner of north parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 145 7 03/13/02 106400 3760 4000/28 days CSC 146 28 04/03/02 CSC 147 28 04/03/02 CSC 148 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of 0 Z Curing: Methods: ASTM C -39 Fracture: A n B C D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilijedahl FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: CoppeIIISD PROJECT: Coppell ISD Service Center, Coppell, Texas Report Date: March 15, 2002 Project No.: 0701 -2233 SAMPLE DATE: March 6, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group Inc 119518 CONCRETE SUPPLIER: Hanson 44 PLANT/TRUCK: 27/648 53 MIX ID NUMBER: 9351 3:30 AIR ( %) (ASTM C -231) : 4.0 4:00 WATER ADDED (gal): 5 Partly Cloudy SLUMP (in.) (ASTM C -143) : 5.0 Approach at north parking lot onwest end of parking lot CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CSC 141 7 03/13/02 99100 3510 4000/28 days CSC 142 28 04/03/02 CSC 143 28 04/03/02 CSC 144 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Curing: I Methods: ASTM C -39 Fracture: A n B® C D REMARKS: Technician: Hector Salazar FUGRO SOUTH INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl