Loading...
SC-Coppell MSW-LR020311FUGRO SOUTH, INC. rims CIRD 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE: March 11, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas PROJECT NO: 0701 -2233 DATE PERFORMED: March 7, 2002 General Contractor: Cortez Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Paving at parking lot on south end of project Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Julio Villarreal Fugro South Technician SMH /bg Distribution 4:00 12:00 700 4.50 to 5.5 5.0 Hanson -Plant No: 27 45 - 52 °F 7/28 24 No FUGRO SOUTH, INC. Reviewed By: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. �fsRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD REPORT DATE March 11, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas PROJECT NO: 0701 -2233 DATE PERFORMED: March 6, 2002 General Contractor: Coppell ISD Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Hector Salazar Fugro South Technician Paving at north parking lot firelane and southwest half of parking lot 3:00 a.m. 2:00 p.m. 710 4.0 to 6.0 5.0 Hanson -Plant No: 27 53 - 60 °F 4000/28 28 No FUGRO SOUTH, INC. Reviewed By: '-tx �� SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD PROJECT Coppell ISD Service Center, Coppell, Texas REPORT DATE March 11, 2002 PROJECT NO : 0701 -2233 DATE PERFORMED: March 5, 2002 Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D -698 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark gray clay with organics (lime treated) 93.6 24.2 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 37 1 Parking lot on north side of building, 50 90.4 24.6 96.6 feet east of firelane on west side, final 38 1 Parking lot on north side of building, 150 90.6 27.2 96.8 feet east of firelane on west side, final 39 1 Parking lot on north side of building, 250 93.0 24.4 99.4 feet east of firelane on west side, final Remarks: All densities meet project specifications unless otherwise noted. William Granger Fugro South Technician FUGRO SOUTH INC. Reviewed By: SMHIbg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl