SC-Coppell MSW-LR020305FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484 -8301; Fax (972) 620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: March 5, 2002
PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233
SAMPLE DATE: February 22, 2002
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group Inic;
84604
CONCRETE SUPPLIER:
Hanson
63
PLANT/TRUCK:
27/885
66
MIX ID NUMBER:
4351
12:00 p.m.
AIR ( %) (ASTM C -231) :
4.5
12:45 p.m.
WATER ADDED (gal):
0
Sunny
SLUMP (in.) (ASTM C -143) :
5
Paving on South
Drive Lane, 25 feet north of bus parking lot
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
SPECIFIED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CSC 129
7
03 -01 -02
96300
3410
3600/28 days
CSC 130
28
03 -22 -02
CSC 131
28
03 -22 -02
CSC 132
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31
Testing ASTM C -143,
Types of
Z
Curing:
I Methods: ASTM C -39
Fracture: A® B® C D
REMARKS:
Technician
Julio Villarreal
FUGRO SOUTH INC.
Reviewed By:
SMH /bg
Distribution
K A Sparks Contractors Inc. — Jim Schooler
K A Sparks Contractors Inc. — Rick McKinney (Fax: 972 - 462 -9320)
City of Coppell - Lee Stone
City of Coppell - Garreth Campbell
Coppell ISD - Mickey Harper
SHW Group — Mike Elmore
SHW Group — Dale Lilljedahl
FUGRO SOUTH, INC.
-P
1
2880 Virgo Lane; Dallas, Texas 75229
Ph(972)484 -8301; Fax(972)620 -7328
COMPRESSIVE STRENGTH OF CONCRETE REPORT
CLIENT: Coppell ISD Report Date: March 5, 2002
PROJECT: Coppell ISD Service Center, Coppell, Texas Project No.: 0701 -2233
SAMPLE DATE: February 22, 2002
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F):
CONCRETE TEMP. ( °F) (ASTM C- 1064):
TIME BATCHED:
TIME SAMPLED:
WEATHER CONDITION:
LOCATION OF PLACEMENT:
Cortez Group Inc.
84615
CONCRETE SUPPLIER:
Hanson
65
PLANT/TRUCK:
27/844
72
MIX ID NUMBER:
9351
2:40 p.m.
AIR ( %) (ASTM C -231) :
4.0
3:15 p.m.
WATER ADDED (gal):
10
Sunny
SLUMP (in.) (ASTM C -143) :
5 -1/2
Paving on South Drive Lane, 110 feet north of bus parking lot
CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 6" x 12 ", 28.27 square inches
TOTAL
COMPRESSIVE
SPECIFIED COMPRESSIVE
CYLINDER
AGE
DATE
LOAD
STRENGTH
STRENGTH
NUMBER
(days)
TESTED
(pounds)
(psi)
(psi)
CSC 133
7
03 -01 -02
63000
2230
3600/28 days
CSC 134
28
03 -22 -02
CSC 135
28
03 -22 -02
CSC 136
Hold
Fracture mode is (A) unless otherwise noted
Specifications:
Making & ASTM C -31
Testing ASTM C -143,
Types of
Z
Curing:
Methods: ASTM C -39
Fracture: A® B® C D
REMARKS:
Technician
Julio Villarreal
FUGRO SOUTH INC.
Reviewed B .
SMH /bg
Distribution
K A Sparks Contractors Inc. - Jim Schooler
K A Sparks Contractors Inc. - Rick McKinney (Fax: 972 - 462 -9320)
City of Coppell - Lee Stone
City of Coppell - Garreth CampbeIr
Coppell ISD - Mickey Harper
SHW Group - Mike Elmore
SHW Group - Dale Lilljedahl