SC-Coppell MSW-LR020201FUGRO SOUTH, INC.
a
2880 Virgo Lane; Dallas, Texas 75229
Ph(972)484 -8301; Fax(972)620 -7328
LIME STABILIZED SOIL PULVERIZATION REPORT
CLIENT: Coppell ISD REPORT DATE February 1, 2002
PROJECT: Coppell ISD Service Center, Coppell, Texas PROJECT NO 0701 - 2233
DATE PERFORMED: January 28, 2002
Contractors on Site: Coppell ISD
Remarks Pulverization /Gradation tests were performed. Locations and results are listed below:
LIME STABILIZED SOIL PULVERIZATION TEST RESULTS
Location
Percent
Passing 1 3/4"
Sieve
Percent
Passing #4
Sieve
1 Northwest entrance to service center
100
64
2 Approach to southwest corner of
100
67
parking lot
Project Requirements: (2)
Minimum 100%
Minimum 60%
(') At roadway moisture condition.
(2) Item 4.6 of Standard Specifications for Public Works Construction of North Central Texas
Council of Governments, 1993 Edition.
Hector Salazar
Fugro South Technician FUGRO SOUTH, INC.
Reviewed By: - �—���_
SMH /bg
Distribution: K A Sparks Contractors Inc. – Jim Schooler
K A Sparks Contractors Inc. – Rick McKinney (Fax: 972 - 462 -9320)
City of Coppell - Lee Stone
City of Coppell - Garreth CampbeH–'"�
Coppell ISD - Mickey Harper
SHW Group – Mike Elmore
SHW Group – Dale Lilljedahl