Loading...
SC-Coppell MSW-LR020201FUGRO SOUTH, INC. a 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD REPORT DATE February 1, 2002 PROJECT: Coppell ISD Service Center, Coppell, Texas PROJECT NO 0701 - 2233 DATE PERFORMED: January 28, 2002 Contractors on Site: Coppell ISD Remarks Pulverization /Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Location Percent Passing 1 3/4" Sieve Percent Passing #4 Sieve 1 Northwest entrance to service center 100 64 2 Approach to southwest corner of 100 67 parking lot Project Requirements: (2) Minimum 100% Minimum 60% (') At roadway moisture condition. (2) Item 4.6 of Standard Specifications for Public Works Construction of North Central Texas Council of Governments, 1993 Edition. Hector Salazar Fugro South Technician FUGRO SOUTH, INC. Reviewed By: - �—���_ SMH /bg Distribution: K A Sparks Contractors Inc. – Jim Schooler K A Sparks Contractors Inc. – Rick McKinney (Fax: 972 - 462 -9320) City of Coppell - Lee Stone City of Coppell - Garreth CampbeH–'"� Coppell ISD - Mickey Harper SHW Group – Mike Elmore SHW Group – Dale Lilljedahl