Loading...
SC-Coppell MSW-LR010928FUGRO SOUTH, INC. Cann 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: September 28, 2001 PROJECT: Coppell Middle School West, Coppell, Texas Project No.: 0701 -2192 SAMPLE DATE: September 18, 2001 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 933708 CONCRETE SUPPLIER: Hanson 72 PLANTITRUCK: 27/648 84 MIX ID NUMBER: 9351 3:40 am AIR ( %) ( ASTM C -231) : 5.5 4:00 am WATER ADDED (gal): 5 Dark SLUMP (in.) (ASTM C -143) : 53/4 Paving: Driveway between the school & stadium, sampled at 20 feet south of concession stand building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 5 7 09/25/01 118900 4210 3600/28 days CMS 6 28 10/16/01 CMS 7 28 10/16/01 CMS 8 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® Curing: Methods: ASTM C -39 B® C D REMARKS: 400 PSI Used. Technician: Jose Rivera FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. � GRiD 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date September 28, 2001 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0701 -2192 SAMPLE DATE: September 18, 2001 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C - 1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 933728 CONCRETE SUPPLIER: Hanson 75 PLANT/TRUCK: 271924 86 MIX ID NUMBER: 9351 6:24 am AIR ( % ) (ASTM C -231) : 5.0 7:00 am WATER ADDED (gal): 10 Partly cloudy SLUMP (in.) (ASTM C -143) : 51/4 Paving: Driveway between school & stadium, sampled at 50 feet south of Wrongler Road 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 13 7 09/25/01 125300 4430 3600/28 days CMS 14 28 10/16/01 CMS 15 28 10/16/01 CMS 16 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, ASTM C Types of Fracture: A® z Curing: Methods: -39 B® C D REMARKS: Technician: Jose Rivera FUGRO SOUTH INC. Reviewed By: 4==77 SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. �GRO 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date: September 28, 2001 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0701 -2192 SAMPLE DATE: September 18, 2001 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. ( °F) (ASTM C -1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: K. A. Sparks 933715 CONCRETE SUPPLIER: Hanson 73 PLANT/TRUCK: 27/648 84 MIX ID NUMBER: 9351 4:35 am AIR ( % ) (ASTM C -231) : 5.0 5:20 am WATER ADDED (gal): 10 Dark SLUMP (in .) (ASTM C -143) : 43/4 Paving: Driveway between school & stadium, sampled at 200 feet north of concession stand building 7 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 9 7 09/25/01 117300 4150 3600/28 days CMS 10 28 10/16/01 CMS 11 28 10/16/01 CMS 12 Hold Fracture mode is (A) unless otherwise noted Specifications: & ASTM C -31 ® ® Z Curing: Methods: ASTM C -39 Fracture: A B C D REMARKS: Technician: Jose Rivera FUGRO SOUTH INC. Reviewed By: SMH /rm Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl