SC-Coppell MSW-LR010927FUGRO SOUTH, INC. A �� 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD c/o K A Sparks Report Date: September 27, 2001 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0701 -2192 DATE PERFORMED: September 18, 2001 Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D -698 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Brown silty clay with some gravel and organics 102.1 20.8 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 14 1 6 inch sanitary sewer crossing between 102.0 24.3 99.9 Middle School and Stadium Stands, 2 feet below grade 15 1 6 inch sanitary sewer crossing between 101.4 24.0 99.3 Middle School and Stadium Stands, 12 inches below grade 16 1 6 inch sanitary sewer crossing between 102.2 22.6 100.1 Middle School and Stadium Stands, final Remarks: All densities meet project specifications unless otherwise noted. Jose Rivera Fugro South Technician FUGRO SOUTH INC. Reviewed By: S �� SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. a h � 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: September 27, 2001 PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO : 0701 -2192 DATE PERFORMED: September 18, 2001 General Contractor: K.A. Sparks Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Paving Driveway between Middle School and the following location: Stadium Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F): Strength required (psi /days): Number of cylinders made: Superplasticizer used: Jose Rivera Fugro South Technician 3:00 a.m. 8:30 a.m. 300 4 -3/4 to 6.0 5.0 Hanson -Plant No: 27 84 — 86 °F 3600/28 12 No FUGRO SOUTH, INC. Reviewed By: SM H /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. �GRO . M 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 OBSERVATION OF CONCRETE PLACEMENT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: September 27, 2001 PROJECT Coppell Middle School West, Coppell Texas PROJECT NO: 0701 -2192 DATE PERFORMED: September 21, 2001 General Contractor: K.A. Sparks Method of Test Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range ( °F) Strength required (psi /days): Number of cylinders made: Superplasticizer used: Paving at approach at Wrangler Road and West Driveway between Stadium and Middle School, also at parking lot, north additiion 8:00 a.m. 10:30 a.m. 100 5.5 to 6.0 5.0 Hanson -Plant No: 27 83 - 85 °F 3600/28 10 No Jose Rivera Fugro South Technician FUGRO SOUTH, INC. Reviewed By: S �k SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. A URD 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date September 27, 2001 PROJECT: Coppell Middle School West, Coppell, Texas Project No .: 0701 - 2192 DATE PERFORMED: September 21, 2001 Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D -698 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Brown silty clay with some gravel and organics 102.1 20.8 2 Dark brown clay 97.3 23.4 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 17 1 Paving subgrade at the approach at 100.8 21.6 98.7 Wrangler Road and West Driveway, final 18 2 Paving subgrade at the approach of West 94.1 25.8 96.7 Driveway and north parking lot, final 19 2 Paving subgrade at east parking lot area, 95.1 23.8 97.7 north addition, final Remarks: All densities meet project specifications unless otherwise noted. Jose Rivera Fugro South Technician FUGRO SOUTH INC. Reviewed By: S !� SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl