Loading...
SC-Coppell MSW-LR011005FUGRO SOUTH, INC. �GR0 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 FIELD DENSITY REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date October 5, 2001 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0701 - 2192 DATE PERFORMED: September 28, 2001 Density Test Method: ASTM D -2922 & 3017 Method of Compaction: ASTM D -698 MOISTURE /DENSITY RELATIONS Material Proctor Results Number Description Maximum Dry Density (pcf) Optimum Moisture ( %) 1 Dark brown sandy silty clay with gravel 117.4 11.4 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY MOISTURE PERCENT OF NO. NO. WEIGHT CONTENT PERCENT MAXIMUM DENSITY 20 1 New parking lot between school and 121.1 11.1 103.2 Wrangler Road near southwest corner parking lot, final 21 1 New parking lot between school and 118.1 10.9 100.6 Wranger Road near center of parking lot, final 22 1 New parking lot between school and 116.9 10.6 99.6 Wrangler Road near northeast corner of parking lot, final Remarks: All densities meet project specifications unless otherwise noted. Skip Martin Fugro South Technician FUGRO SOUTH INC. Reviewed By: -- r) , �Z . SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972- 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell -- Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. A GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 LIME STABILIZED SOIL PULVERIZATION REPORT CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: October 5, 2001 PROJECT: Coppell Middle School West, Coppell, Texas PROJECT NO: 0701 -2192 DATE PERFORMED: Septemer 24, 2001 Contractors on Site: Remarks: Pulverization /Gradation tests were performed. Locations and results are listed below: LIME STABILIZED SOIL PULVERIZATION TEST RESULTS Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl Percent Percent Location Passing 1 3/4" Passing #4 Sieve Sieve l'I 1 Northwest parking lot, east half 100 64 2 Northwest parking lot, west half 100 66 Project Requirements: (2) Minimum 100% Minimum 60% (') At roadway moisture condition. (2) Item 4.6 of Standard Specifications for Public Works Construction of North Central Texas Council of Governments, 1993 Edition. Zia Masumi Fugro South Technician FUGRO SOUTH, INC. Reviewed By: SMH /bg Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl FUGRO SOUTH, INC. A �� � M 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 MOISTURE /DENSITY RELATIONSHIP OF SOILS CLIENT: Coppell ISD, c/o K A Sparks REPORT DATE: October 5, 2001 PROJECT Coppell Middle School West, Coppell Texas PROJECT NO 0701 -2192 LAB NO: SAMPLE DATE: September 24, 2001 METHOD OF TEST: SAMPLE IDENTIFICATION: Sample Description: Sample Origin: MOISTURE /DENSITY: Preparation Procedure: Rammer Description: Maximum Dry Density: (lbs /cu ft) Optimum Moisture Content ( %): Zia Masumi Fugro South Technician ASTM D- 698(A) Dark brown sandy silty clay with gravel (lime treated) Northwest Parking Moist Mechanical 117.4 11.4 FUGRO SOUTH INC. Reviewed By: :i? — SMH /bg Distribution: K A Sparks Contractors Inc. – Jim Schooler K A Sparks Contractors Inc. – Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group – Mike Elmore SHW Group – Dale Lilljedahl