Loading...
SC-Coppell MSW-LR020426FUGRO SOUTH, INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484 -8301; Fax (972) 620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT Coppell ISD, c/o K A Sparks Report Date: April 26, 2002 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0701 -2192 SAMPLE DATE: Apirl 16, 2002 1 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C - 1064) TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Concrete 109527 CONCRETE SUPPLIER: Hanson 68 PLANTITRUCK: 27/1015 74 MIX ID NUMBER: 9349 8:10 AIR ( %) (ASTM C -231) : LOAD 8:33 WATER ADDED (gal): NUMBER Cloudy SLUMP (in.) (ASTM C -143) : 4.0 Slab, covered walk way between north Bldg and Bldg F CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 192 7 4/23/02 142200 5030 4000/28 days CMS 193 28 5/14/02 CMS 194 28 5/14/02 CMS 195 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® Z D Curing: Methods: ASTM C -39 B® C REMARKS: Technician: Justin Schleizer FUGRO SOUTH INC. Reviewed By: � � SMH /sv Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl