Loading...
SC-Coppell MSW-LR020425FUGRO SOUTH, INC. �GRO 2880 Virgo Lane; Dallas, Texas 75229 Ph(972)484 -8301; Fax(972)620 -7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Coppell ISD, c/o K A Sparks Report Date April 25, 2002 PROJECT Coppell Middle School West, Coppell, Texas Project No .: 0701 -2192 SAMPLE DATE: April 16, 2002 CONTRACTOR: TICKET NO.: AMBIENT TEMP. ( °F): CONCRETE TEMP. ( °F) (ASTM C- 1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Cortez Group 109523 CONCRETE SUPPLIER: Hanson 67 PLANT/TRIJCK: 27/1827 74 MIX ID NUMBER: 9349 CYLINDER AIR ( %) (ASTM C -231) DATE LOAD WATER ADDED (gal): STRENGTH 7:35 SLUMP (in.) (ASTM C -143) : 4.0 Slab, covered walkway between Buildings F and B, north building CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12 ", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) CMS 188 7 4/23/02 132300 4680 4000/28 days CMS 189 28 5/14/02 CMS 190 28 5/14/02 CMS 191 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C -31 Testing ASTM C -143, Types of Fracture: A® D Curing: Mefhods: ASTM C -39 B C REMARKS: Technician: Justin Schleizer FUGRO SOUTH INC. Reviewed By: SMH /sv Distribution: K A Sparks Contractors Inc. — Jim Schooler K A Sparks Contractors Inc. — Jerry Jones (Fax: 972 - 393 -1228) City of Coppell - Lee Stone City of Coppell - Garreth Campbell Coppell ISD - Mickey Harper SHW Group — Mike Elmore SHW Group — Dale Lilljedahl