Gateway BP(1.6)-LR061020 (2)REPORT OF REINFORCING STEEL OBSERVATION l~~rr~con
ConsuNlnp Enplneers & Sclentlsts
8901 Carpenter Frwy., Suite p I00
Dallaz, Tezaz 75247
@141 630-1010
Date of Service: 10/20/06 Report No.: 94061163.0126
Client No.: 47876 Project No.: 94061163
Client: ProLogis Project: Freeport Corporate Ctr. Bldg. 6
2310 LBJ Freeway Ste 200 Freeway Pkwy & Gateway
Dallas, TX 75234 Coppell, TX
Services: Observe placement of reinforcing for compliance with furnished drawings.
PROJECT DATA
Drawings Utilized: A1.00, A1.01/04, A1.03/03, dated 05/22/06
Locations/Items Observed: Footing for Ramp at SW corner of Building #6
Test Method: Visual Observation
REPORT OF OBSERVATION
ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT
Placing Drawings Approved X Bar Length and Shape ~'' Colurm Tie Spacing & Type
Bar Size X Proper Bar Placement X Stirrup Spacing & Type
Bar Grade X Properly Tied X Welded Splices
Rebar Clean X Dowel Bars in Place X Mechanical Splices
Trash & Debris Removed X Proper Bar Supports X Lapped Splices X
Number of Bars X Proper CoverlClearance X
DiscrepancieslComments: No discrepancies were noted at the time of this observation.
Field Resutts Report To: Garth, Superintendent
Technician: E. Jernigan
Report Distribution:
(1) ProLogis
(1) City of Coppell 7X
(1) City of Coppell TX
(1) Haynes Whaley Assoc Inc
(1) Meinhardt & Assoc Architects Pl
(1) Jordan Construction Services
(1) Meinhardt & Assoc Architects PLLC
Robert D. Ray, ~.T.
Senior Project M Hager
309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.