Loading...
Gateway BP(1.6)-LR061020 (2)REPORT OF REINFORCING STEEL OBSERVATION l~~rr~con ConsuNlnp Enplneers & Sclentlsts 8901 Carpenter Frwy., Suite p I00 Dallaz, Tezaz 75247 @141 630-1010 Date of Service: 10/20/06 Report No.: 94061163.0126 Client No.: 47876 Project No.: 94061163 Client: ProLogis Project: Freeport Corporate Ctr. Bldg. 6 2310 LBJ Freeway Ste 200 Freeway Pkwy & Gateway Dallas, TX 75234 Coppell, TX Services: Observe placement of reinforcing for compliance with furnished drawings. PROJECT DATA Drawings Utilized: A1.00, A1.01/04, A1.03/03, dated 05/22/06 Locations/Items Observed: Footing for Ramp at SW corner of Building #6 Test Method: Visual Observation REPORT OF OBSERVATION ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT ITEMS OBSERVED CORRECT INCORRECT Placing Drawings Approved X Bar Length and Shape ~'' Colurm Tie Spacing & Type Bar Size X Proper Bar Placement X Stirrup Spacing & Type Bar Grade X Properly Tied X Welded Splices Rebar Clean X Dowel Bars in Place X Mechanical Splices Trash & Debris Removed X Proper Bar Supports X Lapped Splices X Number of Bars X Proper CoverlClearance X DiscrepancieslComments: No discrepancies were noted at the time of this observation. Field Resutts Report To: Garth, Superintendent Technician: E. Jernigan Report Distribution: (1) ProLogis (1) City of Coppell 7X (1) City of Coppell TX (1) Haynes Whaley Assoc Inc (1) Meinhardt & Assoc Architects Pl (1) Jordan Construction Services (1) Meinhardt & Assoc Architects PLLC Robert D. Ray, ~.T. Senior Project M Hager 309acs This report is exclusively for the use of the client indicated above and shall not be reproduced without written approval of Terracon.