Belt Line Trade-LR061025
REED EnGinEERinG
"& (j( 0
'7' ,(Pf ~
\ \ -' C~;E CYLINDER TEST REPORT
//' Belt Line Trade Center Building A
( 500 E. Belt Line Road
Coppell, Texas
GROLJP
GEOTECHNICAL AND
ENVIRONMENTAL CONSULTANTS
REPORTED TO: 101
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
ATTN: Mr. Chris Parnell
REPORT NO. 133
REG PROJECT NO. 13335
SAMPLE DATE: 09-27-06
TECHNICIAN: TSIT
PAGE: 1 of 2
CONTRACTOR: Raymond Construction
Location of Sam
Set Number
1
2
3
4
5
6
Ie
Location
Paving: 50'S, 70'E from NE bldg. corner
Paving: 60'S, 190'E from NE bldg. corner
Paving: 40'S, 250'E from NE bldg. corner
Paving: 80'N, 80'E from NE bldg. corner
Paving: 100'N, 200'E from NE bldg. corner
Pavin : 6'N, 100'W from NW bid. corner
Age@ Total Load
Date Tested Test Ibs.
10-04-06 7 99230
10-25-06 28 127190
10-25-06 28 116630 4320
Hold H
2 7126 1 0-04-06 7 86020 3040
7126 10-25-06 28 122130 4320
7126 10-25-06 28 117040 4140 4230
7126 Hold H
3 7127 1 0-04-06 7 85410 3020
7127 10-25-06 28 119300 4220
7127 10-25-06 28 115620 4090 4160
7127 Hold H
4 7128 1 0-04-06 7 78060 2760
7128 1 0-25-06 28 115620 4090
7128 1 0-25-06 28 117890 4170 4130
7128 Hold H
'-
~J / if-
2424 STUTZ DR. . SUITE 400 . DALLAS, TX 75235 . TEL [214] 3505600 . FAX [214J 3500019
Mix Identification
1551
ecified Stren
4000
REPORT NO. 133
REG PROJECT NO. 13335
SAMPLE DATE: 09-27-06
PAGE: 2 of 2
6
7130
7130
7130
7130
Date Tested
1 0-04-06
10-25-06
10-25-06
Hold
Age@
Test
7
28
28
H
1 0-04-06
10-25-06
10-25-06
Hold
7
28
28
H
Total Load
Ibs.
82100
121560
124110
94250
116420
116720
Mail
Distribution: (1) IDI/Mr. Chris Parnell
(1) Raymond Construction/
Mr. David Layne
(1) City of Coppell/Mr. Larry Davis
(1) City of Coppell/Mr. Lee Stone
Submitted by:
3340
4120
4130
Air
Entrainment
4.6
5.0
5.4
5.5
5.2
5.0
4350
4130
Ticket
Number
7171218
NA
7171238
NA
NA
NA
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc