SS9901-LR050630iexas CMT Inc.
M
Construction Materials Testing
and Environmental Consulting
10044 Monroe Drive Dallas, Texas 75229 (214) 352 -6957 Fax (214) 352 -6972 www.texascmt.com
REINFORC ST EEL PLACEMENT
Report Date: June 30, 2005 Test Date: June 29, 2005
Client: City of Coppell General Report No.: 1
Project DeForest & Sandy Lake Wastewater Project No.: 205 -0126
Lift Stations: Project - SS 99 -01
Identification Reinforcing Steel Observation
Method of Test Visual Observation
Page 1 of 1
Results
On Juae 29, 2005 reinforcing steel was observed at the following locations:
Wet well matt foundation @ El. 416.5
The following discrepancies were noted and called to the attention of Tommy, a representative of
Canfer Construcion:
Missing 2 #7's in top of matt of steel
The above discrepancies will be corrected prior to concrete placement.
Technician: RG
cc. Mr. Rick O'Dell - City of Coppell
Mr. Todd C. Hoff - Canfer Construction Co.
Ms. Erika K. Cooper - Turner, Collie & Braden
Mr. Bobby Barr - Onsite cell: 469 -556 -6469