Loading...
SS9901-CS050302Turner Collie 0Braden Inc. TRANSMITTAL To: See Distribution of-, From: Erika K. Cooper, P.E. — TCB Date: March 2, 2005 Job No.: 052 131124.0001 04000.Al23 (2.1) Subject: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04- 44 -047A (Generator Connection Panel Assembly) Submittal No. 04- 44 -048A (Pipe & Misc) TCB has the following comments on these submittals: Description Status Comment Generator Connection No Exception Taken Panel Assembly Pipe & Misc Make Corrections Noted • Use ductile iron thickness Class 50 for 16 -inch, 20 -inch, and 30 -inch yard piping • Maximum joint deflection of full length pipe must not exceed 80% of manufacturer's recommended maximum deflection • Use ductile iron thickness Class 53 (minimum) for all above grade piping in lift stations and valve vaults • Provide Megalug for PVC pipe on bypass lines at Deforest and Sandy Lake • 3/4 -inch or 1 -inch post hydrant not needed • On 2 -inch post hydrant, provide national straight thread hose connection, 1/8- inch (minimum) drain hole, and aluminum casing guard • Provide 4 -inch PVC hub on floor drain • Size Link -Seal per manufacturer's recommendation for opening and pipe sizes When you re- submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can -Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other 3.Y2/05 1 / I P'\CoppcIRDF -SULS ConstToi-s \Shop Dwg Trans 2005.03.02. doc