Loading...
SS9901-CS050207TurnerCollieOBraden Inc TRANSMITTAL To: See Distribution �Acc From: Erika K. Cooper, P.E. — TCB Date: February 7, 2005 Job No.: 052 131124.0001 04000.Al23 (2.1) Subject: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04- 44 -003A (Door Hardware Schedule) Submittal No. 04- 44 -004A (Metal and FRP Doors) Submittal No. 04- 44 -018A (Parshall Flume) TCB has the following comments on these submittals: Description Status Comment Door Hardware Make Corrections Noted • Door D -1 show OUT FR IN Schedule • Door D -2 match existing door • Select GRAY for both FRP doors Metal and FRP Doors Make Corrections Noted • Door D - 1 show OUT FR IN • Door D -2 match existing door • Select GRAY for both FRP doors Parshall Flume No Exception Taken When you re- submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can -Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other 217105 1 / 1 P. \Coppe110F -SL\LS Const \Corres \Shop Dwg Trans 2005.02.07.doc