SS9901-CS050207TurnerCollieOBraden Inc TRANSMITTAL
To: See Distribution �Acc
From: Erika K. Cooper, P.E. — TCB
Date: February 7, 2005
Job No.: 052 131124.0001 04000.Al23 (2.1)
Subject: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
DeForest & Sandy Lake Wastewater Lift Stations
Shop Drawing Review Comments
Submittal No. 04- 44 -003A (Door Hardware Schedule)
Submittal No. 04- 44 -004A (Metal and FRP Doors)
Submittal No. 04- 44 -018A (Parshall Flume)
TCB has the following comments on these submittals:
Description
Status
Comment
Door Hardware
Make Corrections Noted
• Door D -1 show OUT FR IN
Schedule
• Door D -2 match existing door
• Select GRAY for both FRP doors
Metal and FRP Doors
Make Corrections Noted
• Door D - 1 show OUT FR IN
• Door D -2 match existing door
• Select GRAY for both FRP doors
Parshall Flume
No Exception Taken
When you re- submit the shop drawings, please address all comments and submit eight (8) copies to
this office.
Distribution: [X] 2 copies of submittal to the City
[X] 4 copies of submittal to Can -Fer Construction Company, Inc.
[X] 2 copies of submittal to TCB file
[ ] Other
217105 1 / 1 P. \Coppe110F -SL\LS Const \Corres \Shop Dwg Trans 2005.02.07.doc