SS9901-CS050126TurnerCollieOBraden Inc. TRANSMITTAL
To: See Distribution �%S
From: Erika K. Cooper, P.E. — TCB
Date: January 26, 2005
Job No.: 052 131124.0001 04000.Al23 (2.1)
Subject: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
DeForest & Sandy Lake Wastewater Lift Stations
Shop Drawing Review Comments
Submittal No. 04- 44 -022A (High Range Water Reducing Admixture)
Submittal No. 04- 44 -026A (Electrical Building Rebar)
Submittal No. 04- 44 -027A ( Rebar)
Submittal No. 04- 44 -028A (SCADA)
Submittal No. 04- 44 -036A (Plug Valves)
TCB has the following comments on these submittals:
Description
Status
Comment
High Range Water
No Exception Taken
Reducing Admixture
Electrical Building
No Exception Taken
Rebar
Rebar
No Exception Taken
SCADA
Make Corrections Noted
• Provide output and input locations in the
SCADA panel for all pumps including
the future 4th pump at Sandy Lake
Plug Valves
Make Corrections Noted
. Provide only one (1) 10 -inch Val -Matic
Plug Valve w/ Gear & Nut
• Provide three (3) 10 -inch Val -Matic
Plug Valves w/ Gears & Handwheels
• Field verify length of FloorStand
Extension Stems required
0 Provide three (3) 18 -inch Plug Valves to
meet Pressure Rating of 150 psi per
Specification Section 15106
• Provide both Floorstands w/ Handwheel
(no nut operated floorstands)
When you re- submit the shop drawings, please address all comments and submit eight (8) copies to
this office.
Distribution: [X] 2 copies of submittal to the City
[X] 4 copies of submittal to Can -Fer Construction Company, Inc.
[X] 2 copies of submittal to TCB file
[ ] Other
1/26/05 1 / 1 P \Coppe111DF -SL\LS Const\Coms \Shop Dwg Tians 2005.01.26.doc