Loading...
SS9901-CS050126TurnerCollieOBraden Inc. TRANSMITTAL To: See Distribution �%S From: Erika K. Cooper, P.E. — TCB Date: January 26, 2005 Job No.: 052 131124.0001 04000.Al23 (2.1) Subject: Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04- 44 -022A (High Range Water Reducing Admixture) Submittal No. 04- 44 -026A (Electrical Building Rebar) Submittal No. 04- 44 -027A ( Rebar) Submittal No. 04- 44 -028A (SCADA) Submittal No. 04- 44 -036A (Plug Valves) TCB has the following comments on these submittals: Description Status Comment High Range Water No Exception Taken Reducing Admixture Electrical Building No Exception Taken Rebar Rebar No Exception Taken SCADA Make Corrections Noted • Provide output and input locations in the SCADA panel for all pumps including the future 4th pump at Sandy Lake Plug Valves Make Corrections Noted . Provide only one (1) 10 -inch Val -Matic Plug Valve w/ Gear & Nut • Provide three (3) 10 -inch Val -Matic Plug Valves w/ Gears & Handwheels • Field verify length of FloorStand Extension Stems required 0 Provide three (3) 18 -inch Plug Valves to meet Pressure Rating of 150 psi per Specification Section 15106 • Provide both Floorstands w/ Handwheel (no nut operated floorstands) When you re- submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can -Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other 1/26/05 1 / 1 P \Coppe111DF -SL\LS Const\Coms \Shop Dwg Tians 2005.01.26.doc