Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
SS9901-BD040505 (2)
BID TABULATION: LIFT STATION IMPROVEMENTS FORCE MAIN PROJECT SS 99 -01 LINE `D' ALTERNATIVE II Item Quantity Unit Description Atkins Bros. Jackson S.J. Louis Bar Constructors John Burns Barson Utilities Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price II -1 6,514 LF 30" Ductile Iron Force Main by Open Cut 164.45 1,071,227.30 115.00 749,110.00 181.00 1,179,034.00 161.00 1,048,754.0 116.50 758,881.0 179.50 1,169,263.0 I1-2 499 LF 30" Ductile Iron Force Main by Bore/No Encasement 469.25 234,155.75 521.00 259,979.00 490.00 244,510.00 520.00 259480.00 556.00 277,444.00 530.00 264,470.0 I1 -3 1,736 LF 30" Ductile Iron Force Main by Bore w/48" Steel Encasement 509.06 883,728.1 536.00 930,496.0 490.00 850,640.00 593.00 1,029,44&00 631.50 1,096,284.00 608.00 1,055,488.0 114 27.59 TN Ductile Iron Fittings 100.00 2,759.00 6,500.00 179,335-00 4,000.00 110,360.00 5,400.00 148,986.00 10,600.00 292,454,00 7,120.00 196,440.8 II -5 1 EA 30" Gate Valve w/ Manhole 29,946.30 29,946,30 31,000.00 31,000.00 30,000.00 30,000.00 29,000.00 29,000.00 39,500.00 39,500.00 43,835.00 43,835.0 II -6 10 EA 4" Comb. Sewage Air Vacuum/Air Release Valve w/ Manhole 17,878.90 178,789.00 17,000.00 170,000.00 7,200.00 72,000.00 6,000.00 60,000.00 11,000.00 110,000.00 17,405.00 174,050.0 II -7 21 EA Bore Under Existing Tree / No Encasement 4,998.00 104,959.00 8,000.00 169,000.00 2,500.00 52,500.00 7,600.00 159,600.00 9,000.00 1 g9,000.00 11,085.00 232,785.0 II -8 1 LS Sod 17,400.00 17,400.00 22,000.00 22,000.00 50,000.00 50,000-00 10,900.00 10,900.00 61,000.00 61,000.00 46,478.00 46,478.0 II -9 1 LS Implementation of Traffic Control Plan 1,000.00 1,000.00 10,000.00 10,000.00 20,000.00 20,000.00 17,200.00 17,200.Od 10,000.00 10,000.00 37,305.00 37,305.0 11 -10 1 LS Development and Install Storm Water Pollution Prevention Plan 3,000.00 3,000.00 20,000.00 20,000.00 8,000.00 8,000.00 14,200.00 14,200,00 24,000.00 24,000.00 30,424.00 30,424.0 11 -11 1 LS Hydrostatic Pipe Testing 17,532.50 17,532.50 2,600.00 2,600.00 6,000.00 6,000.00 8,000.00 8,000,00 6,000.00 6,000.00 9,470.00 9,470.0 11 -12 1 LS Pipe Loop 49,500.00 49,500.00 70,000.00 70,0KOC 38,000.00 38,000.00 65,600.00 65,600.00 63,000.00 63,000.00 76,905.00 76,905.0 Calendar Days 180 250 300 3 10 180 210 TOTALS ,E C $ 2,593,996.01 $ 2,612,520.00 $ 2,661044.00 -- ][ $ 2,851,168.00 $ 2,927,563.00 !=$ ,336,913.80 No Bid Hall Albert No Bid Mastec No Bid Insituform