Country Estates-LR 921203Rone Engineers
Geotechnit:ai Consultants
Materials Testing
RoneEngin®
Concrete Cylinder Test Report
Project Purchase Order
BETHEL SCHOOL RD.
Number .: Date of Observation Report Date
D2-064A-O1-19899 NOV. 5
o
CITY OF COPPELL
Location •
SIGN COLUMNS N.E. CORNER OF BETHEL SCHOOL & SHOREWOOD IVE
contractor
REBCON CONTRACTORS
Supplier plant rueic Ticket
TXI 41 98 46611
Mix Number Mix DesGiption
8273 5.5 SACK
Weather Conditions Ambient Temperatwe C°~ Concrete Temperature (°f~
OVERCAST •~ 60 70
tme Sampled Water Added
2:20 PM 0 .0 GALS
Physical Data
ACTUAL ~- I SPECIFICATIONS
SLUMP (in.') 4
Concrete Cylinder Test(s)
ACTUAL ( SPECIFICATIONS
Specimen Age Tot Load Compressive Strength Strength Required
No. (pays) Test date (fbs.) (Psl ~~?
t i
114 7 11/12/92 122000 4320 3600
115 28 12/03/92 163500 5780
116 28 12/03/92 166000 5870
117 HOLD HOLD
Curing Method Test Method Standard 6' x t2' Fstgineer/Technician
C 31 ASTM C 39 Area 2e27 sq. in. STEVE JOHNSTON CRONE)
Rerrsarks and/or Distribution
NATHAN D. MAIER/MIKE GARRETT (1), REBCON CONTRACTORS/
RICH BURCHETTE (1), CITY OF COPPELL/LARRY DAVIS (1)
i
~~ ~~ ~r
r~a Estgineers
UMRA'i7pPt3: The Led rewib presented A«hn v.ne Oreos+ed beeed uaon O+e soeeiNe semoiee orwdea 1« testlng. We seewne no resoonslbYlty t«
vene0on m auellty teomtxamtut, •r>a~sr+~4 peAOrmanee, ate.) «.rry omsr Is.wis of a~ma.r wo~eee m.ew orwa.a by persona «contlttlons wx wniert
v.s Mve no ConaoL Ow leCera antl reeori~ ors S« tt+s e:crosNe use o! fife tllsn0 m Mt0111 tRey w addressed.