Country Estates-LR 921124Rorte Engineers
Geotechnical Consultants
Materials Testing
RoneEngine~ers
Concrete Cylinder Test Report
Project Purchase Order
BETHEL SCHOOL RD.
N~ber Date of Observation Report Date
D2-064A-O1-19710 OCT.
o '
CITY OF COPPELL
Location '
ALLEY A, STA: 0+70
Contractor
REBCON CONTRACTORS
Supprier Plant Truck Ticket
TXI 43 144-
Mix Number Moc Description
8274
Weather Conditions f Ambient Temperature pF~ Concrete Temperature (~f7
PARTLY CLOUDY I '72 70
lme Sampled Water Added .
1Q: 10 AM 0 .0 GALS
Physical Data .
ACTUAL ~ ~ 1 SPECIFICATIONS
SLUMP (in.) 4
Concrete Cylinder Test(s)
ACTUAL SPECIFiCAT10NS
Specimen Age Tot Load Compressive Strength Strength Required
No. {Days) Test Date ~~) ~~ (Psl
98 7 10/30/92 l
100000 3540
4000
99 28 11/20/92 131500 4650
100 28 11/20/92 135000 4780 ~ '
1'01 HOLD HOLD
Curing Method est Method Standard 6' x 72' Ettgineer/Technician
C 3~ ASTM C 39 ea 2827 sq. in. PAUL STOWELL CRONE '
Remarits and~or Distribution
NATHAN D, MAIER/MIKE GARRETT (1), REBCON CONTRACTORS/
RICH BURCHETTE (1), CITY OF COPPELL/LARRY DAVIS (1)
~=
Finne Fn inenn
UMrTA710N3: Th^ test results presentsE Aerein r,ere O~s'oued taued upon O+e so^dM1e.^mole^ oiwid^d for vesonq. We ^awine ne reaponslbURy to
v^n^tlon in qudlty teamoosroon. ^oP^u^nce. performance. etel « uy etnx t^^naa d s~m~l^r wbieu m^a^r txovwed by peiaom w eonoroons wx r.hien
ws nave rw eontroL Our IeRee^ and reports an for M^ ssdusM tree N Cte tllenn to Mwm yfey ^rs ^adrecseC,