Loading...
Country Estates-LR 921119Rone Engineers Geotechnicai Consultants Materials Testing R~~gin Concrete Cylinder Test Report Project Purchase Order BETHEL SCHOOL RD. Number Date of Observation Report Date ' D2-064A-O1-19666 OCT. 20 1992 NOV. 19 1992 ~ c - CITY OF COPPELL Location - ALLEY A, STA: 0+90 Contractor REBCON CONTRACTORS . Supplier Plant - Truck Ticket TXI 31 221 41583 Mix Number Mix Descripiion 8274 Bather Conditions - 'Ambient Temperature (°~ Concrete Temperature (°F7 PARTLY CLOUDY -~ 81 75 tme Sampled Water Added - 3:55 PM 0 .0 GALS Physical Data - - ACTUAL ~~ ~ SPECiFiCATIONS SLUMP (in.) 6 1/4 Concrete Cylinder Test(s) - ACTUAL ( SPEClFlCAT10NS Specimen Age Tot Load Compressive Strength Strength Required No. (Days) Test Date ( pbs.) ~ ~~ ~) t t 90 7 10/27/92 i 94000 3330 4000 91 28 11/17/92 116500 4120 92 28 11/17/92 128000 4530 93 HOLD HOLD Curing Method Test Method Standard b' x 12' Enaineer~echnician ASTM C 3t ,aSTM C 3s Area 2627 sq. tn. PAUL STOWELL (BONE ) Remarks and/or Disfibution NATHAN D. MAZER/MIKE GARRETT (1), REBCON CONTRACTORS/ RICH BURCHETTE (1), CITY OF COPPELL/LARRY DAVIS (1) I - o~.,e ~.,,.t..de~ • •-• - -• UMRATIONS: The test results Press+tled Aere{n were t7repareO base~0 upon SM speCifk samdn OfT+detl !Or testlng. We aswms no reaoonelb4rty !or ~ vanaUOn in Ouallty (t:ompositlon, aopeerance, peAOnnencs, stc) or arty o0+er tsuure d a,milar wbied maser txwbed by persons or oonCttlan wsr whielt ~ we M.e rrp coned. Our Mtlen ane reports ars for the er<dusNe use of 41s dlsnta to whom they °re aodtecsed.