Loading...
Country Estates-LR 921002Rone Engineers Geotechnicai Consultants Materials Testing RoneEngin Concrete Cylinder Test Report Project Purchase Order COUNTRY ESTATES Number Date of observation Report Date D2-211A-O1-19014 SEPT. 1 1992 OCT. 2 1992 o ' H.T. ARDINGER C/O NATHAN MAIER Location INLET TOPS, INTERSECTION BETHEL SCHOOL RD AND HARRIS Contractor H.C.H. CONSTRUCTION SuppNer Ptartt Truc4c Ticket LATTIMORE 3 284 090483 Mix Number Mix Description 38 Weather Conditions Ambient Temperature (°F} Concrete Temperature (°F] CLOUDY ~ 78 90 ime Sampled Water Added 12:40 PM 0.0 GALS Physical Data ACTUAL ~ SPECIFICATIONS SLUMP (in.) 3 Concrete Cylinder Test(s) ACTUAL SPECIFICATIONS Specimen Age Tot Load Compressive Strength Strength Required No. Test Date (Days) ((bs.) (pst) (pst) t 4 7 09/08/92 114000 4030 3000 5 28 09/29/92 124000 4390 6 28 09/29/92 125000 4420 7 HOLD HOLD Curing Method Test Method Standard 6' x 72' Engineer~Tectcrticran Cat ASTM C as Area 2e.2~ sq. in. LANNY GIST CRONE) Remarks and/or Distribution H.T. ARDINGER C/O NATHAN MAIER/MIKE GARRETT (1), NATHAN D. MAIER/ MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1), H.C.H. CONSTRUCTION/JEFF HICKS (1) J ~~~ Rena Enelnears UMRATIONS: The tezt results pratenW 7+ere~n ware D~ ~~ upon the soteitle tarnplea proNdad hX Oettlhq, We uwme n0 resOOn~~~Y ~ vanatl°n m attatuY It:omoasNOn. aopasranet, performance. tact ar eny omer lectors as aundar wbisu madr orovidW by parsons or oondttlont over +vhidr we Ifaye rw eontloL Our Nlters and reports an tpr the asCUSrve use at safe 4bna m whom tlrey are addressed.