Country Estates-LR 921002Rone Engineers
Geotechnicai Consultants
Materials Testing
RoneEngin
Concrete Cylinder Test Report
Project Purchase Order
COUNTRY ESTATES
Number Date of observation Report Date
D2-211A-O1-19014 SEPT. 1 1992 OCT. 2 1992
o '
H.T. ARDINGER C/O NATHAN MAIER
Location
INLET TOPS, INTERSECTION BETHEL SCHOOL RD AND HARRIS
Contractor
H.C.H. CONSTRUCTION
SuppNer Ptartt Truc4c Ticket
LATTIMORE 3 284 090483
Mix Number Mix Description
38
Weather Conditions Ambient Temperature (°F} Concrete Temperature (°F]
CLOUDY ~ 78 90
ime Sampled Water Added
12:40 PM 0.0 GALS
Physical Data
ACTUAL ~ SPECIFICATIONS
SLUMP (in.) 3
Concrete Cylinder Test(s)
ACTUAL SPECIFICATIONS
Specimen Age Tot Load Compressive Strength Strength Required
No. Test Date
(Days) ((bs.) (pst) (pst)
t
4 7 09/08/92 114000 4030
3000
5 28 09/29/92 124000 4390
6 28 09/29/92 125000 4420
7 HOLD HOLD
Curing Method Test Method Standard 6' x 72' Engineer~Tectcrticran
Cat ASTM C as Area 2e.2~ sq. in. LANNY GIST CRONE)
Remarks and/or Distribution
H.T. ARDINGER C/O NATHAN MAIER/MIKE GARRETT (1), NATHAN D. MAIER/
MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1),
H.C.H. CONSTRUCTION/JEFF HICKS (1)
J ~~~
Rena Enelnears
UMRATIONS: The tezt results pratenW 7+ere~n ware D~ ~~ upon the soteitle tarnplea proNdad hX Oettlhq, We uwme n0 resOOn~~~Y ~
vanatl°n m attatuY It:omoasNOn. aopasranet, performance. tact ar eny omer lectors as aundar wbisu madr orovidW by parsons or oondttlont over +vhidr
we Ifaye rw eontloL Our Nlters and reports an tpr the asCUSrve use at safe 4bna m whom tlrey are addressed.