Loading...
Country Estates-LR 920831reed engineering C~G30MG°~ GEOTECHNICAL CONSULTANTS August 31, 1992 Project No. 1154/Report No. 3 H.T. Ardinger and Son Company c/o Nathan D. Maier Consulting Engineers Three Northpark 8800 N. Central Expressway, Suite 300 Dallas, Texas 75231 ATTN: Mr. Michael J. Garrett Re: Constructi Beth 1 Sch Harri L Conoel Gentlemen: ~~~. Materials Testing 1 Road and Reconstruction as Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities of August 7, 1992. On the above referenced date, two field density tests were taken on the fill placed in Sanitary Sewer Line B. Test results are shown on Plate 1. Where tested, the materials were found to be in compliance with project specifications. If you have any questions, do not hesitate to call. Sincerely, THE REED ENGINEERI/~ GROUP ~ /~ ,/ Ronald F. Reed, P.E. RFR/aap copies submitted: (1) H.T. Ardinger and Son Company c/o Nathan D. Maier Consulting Engineers/ Mr. Michael J. Garrett (1) Matthews Investments Southwest, Inc./ Mr. Tim House J1) City of Coppell/Mr. Larry Davis (1) HCH Construction, Inc./Mr. Mark Hicks 2424 STUTZ DRIVE ^ SUITE 400 ^ DALLAS, TEXAS 75235 ^ 214/350-5600 ^ 1FAX? 214/350-0019 reed engineering ®L~OO RJL~ HETHEL SCHOOL ROAD AND HARRIS LANE RECONSTRUCTION COPPELL, TEBAB REPORT NO. 3 Date 08-07-92 Field Density Tests Depth Com- Below Unit pac- Final Dry Moisture tion Test S. G. Weight Content Curve Level No. Location feet (pcf) f$) No. (~) 14 Line B/ STA 0+00 6.5 108.2 18.2 CE-1 97.5 15 Line B/ STA 0+35 3.0 107.5 18.6 CE-1 96.8 GEOTECHNICAL CONSULTANTS Plate 1