Country Estates-LR 920831reed engineering
C~G30MG°~
GEOTECHNICAL CONSULTANTS
August 31, 1992
Project No. 1154/Report No. 3
H.T. Ardinger and Son Company
c/o Nathan D. Maier Consulting Engineers
Three Northpark
8800 N. Central Expressway, Suite 300
Dallas, Texas 75231
ATTN: Mr. Michael J. Garrett
Re: Constructi
Beth 1 Sch
Harri L
Conoel
Gentlemen:
~~~.
Materials Testing
1 Road and
Reconstruction
as
Submitted here are the results of testing and observation of
construction materials at the referenced project. This report
addresses the activities of August 7, 1992.
On the above referenced date, two field density tests were taken on
the fill placed in Sanitary Sewer Line B. Test results are shown on
Plate 1. Where tested, the materials were found to be in compliance
with project specifications.
If you have any questions, do not hesitate to call.
Sincerely,
THE REED ENGINEERI/~ GROUP
~ /~ ,/
Ronald F. Reed, P.E.
RFR/aap
copies submitted: (1) H.T. Ardinger and Son Company
c/o Nathan D. Maier Consulting Engineers/
Mr. Michael J. Garrett
(1) Matthews Investments Southwest, Inc./
Mr. Tim House
J1) City of Coppell/Mr. Larry Davis
(1) HCH Construction, Inc./Mr. Mark Hicks
2424 STUTZ DRIVE ^ SUITE 400 ^ DALLAS, TEXAS 75235 ^ 214/350-5600 ^ 1FAX? 214/350-0019
reed engineering
®L~OO RJL~
HETHEL SCHOOL ROAD AND
HARRIS LANE RECONSTRUCTION
COPPELL, TEBAB
REPORT NO. 3
Date
08-07-92
Field Density Tests
Depth Com-
Below Unit pac-
Final Dry Moisture tion
Test S. G. Weight Content Curve Level
No. Location feet (pcf) f$) No. (~)
14 Line B/
STA 0+00 6.5 108.2 18.2 CE-1 97.5
15 Line B/
STA 0+35 3.0 107.5 18.6 CE-1 96.8
GEOTECHNICAL CONSULTANTS
Plate 1