SS9901-CS050422r c 997-2-04770 P 04/05
PFF a.
<_� 1^ Er, FP TI RHEP DDLLIE� BPPE04972 3_ 5�E1r TO
1-rom= 04/11/2005 19.47 #985 P.001/001
Request for Information
Detailed, RFIs without Collaboration and Impact Info
Grouped by RFf Number
Oaforest & Sandy Lak4 Lift S soon Pro)oct # 04-" Can -For Construetlen Company, Inc.
Tel: Fax:
FZFi #. 01 1 Data Croat"; 00
��►+i�'J�iih•i�a�i�alri�r ��svr�r�'i��:�t �C�i�i1±:6ote��Ci1i����� �lit�i;ti�ii�:
Turner Collie & Braden Inc Erika Cooper Can -Fer Construction Company, Todd Hoff
fnc
17300 Dallas Parkway 11031 Grissom Lane
Suite 1010 Dallas, TX 75229
Dallas TX 75248
Brick
ICS:. :exatiipsi�yc;tis;oF'3a�3tai doii:.atr;s
f►�f#i4'db>h� �'#ii��iid1'.+rd;: �ilFlel'f2l'��:
To date we have gone to two brick manufacturers and two general brick suppliers to match the brick out on the project
The exfcting brick is not an acme brick, as described in the Specifications it Is a beck from a smaller company and
`hough the color an t®xture is still availabl9 it is not available in the 3° x 10 si ze as exists The closest we can get is a
King Size Frick.
�$iICQt1'
5tje A+T*e. A
6f --�e C' er---
. tt#� w-w. ::
V- t 2 -
Prt+lop LT Printod on. 4/12/2005 o:t ..lovaell ddforest & sandy lake ftft stsnon.prod Pagel dt 1
WF' 200'- 13 r - 1 7 , FP TOPPIER CLiLL I E: BPADEh1' + 2 3� 3002 TO '9`9723043570 P 05 05
deForest and Sandy Lake Wastewater Lift Stations
RFI No 11
Response Date Apri122 2005
TCB Project no 052131124 0001 04000.A103
The intent of the drawings and specifications was to get brick that matches the existing brick in
color and texture only, not size or manufacturer Brick size should be per the specifications,
which is a modular size
If you have any further questions, please feel free to contact Erika Cooper at 972 -735 -3056
cc Rick O'Dell, Project Inspector — City of Coppell
File
** TOTAL PAGE 05 **