Loading...
SS9901-CS050422 (2)APP 'ISO[ 1. 06 FP TI_IF'NEP =OLL I E' BRPDEN9 7 c 5c 700- TO '?O 33 � c P ©2 '�5 From 04, /2005 18:55 #944 P.001/001 Request for Information Detailed, RFIv without tloliaboratlon and impact info Grouped by RF' Number Doforinst & Sandy Lake Lift Station Project It 04-44 Can -Far Construction Company, Inc Tel; Fax: . �� RFl 0: ��e A'�ia*". d&W4*11Sf Is1iW F�iB' t tliAf aiit�tp>Yeicy! idl 7ifiiAll4'�j Tumor Callle & Braden Inc. Enka Cooper Can-For Construction Company, Todd Hate Inc 17300 Dallas parkway 11031 Grissom Lane SwiP 1010 Dallas TX 75229 Dii a s Tk 752-48 _ :wwot t Sheet Piling '640165. 'Wa i i b� 4 � After the lift station is poured out Can -Fer Construction would like to abandon the shoring in place and backfili around the shoring Is this acceptablo? *YIdOlt%. z 4 4.4L.n 1 ' Prokg LT - Printed on 4/4/2005 o1- WoppeU ddfore8t 3 sandy lake IM statlon.Pmd Page 1 of 1 OPP 22 y - - 13 OG FP TUPHEP COLLIE= BPODEH9 7=3 3002 TO 9971 04 P 03' Oc DeForest and Sandy Lake Wastewater Lift Stations RFI No 9 Response Date April 22, 2005 TCB Project no 052131124 0001 04000A103 Shoring for the DeForest Lift Station can be abandoned in place except for shoring within 5 feet horizontally of any piping entering or exiting the lift station Within this zone, the shoring must be removed over its ertire vertical extent. Remove any shoring to remain to at least 5 feet below grade This change will be at no cost to the City If you have any further questions, please feel free to contact Erika Cooper at 972- 735 -3056 cc Rick O'Dell Project inspector — City of Coppell File