Belt Line Trade-LR061101
~::RE/j;Z~;teST ~~o~:~~~r;~~~;:~,~:: ~'::
Belt Line Trade Center Building A
500 E. Belt Line Road
Coppell, Texas
REPORTED TO: 101
5420 LBJ Freeway, Suite 1275
Dallas, Texas 75240
A TTK'" Mr Chris Parnell
CONTRACTOR: Raymond Construction
Age@ Total Load
Date Tested Test Ibs.
1 0-11-06 7 86870
11-01-06 28 118400
11-01-06 28 115080
Hold H
7373 1 0-11-06 7 101580 3590
7373 11-01-06 28 124580 4410
7373 11-01-06 28 128500 4550
7373 Hold H
7374 1 0-11-06 7 86250 3050
7374 11-01-06 28 118050 4180
7374 11-01-06 28 119890 4240
7374 Hold H
7375 1 0-11-06 7 97200 3440
7375 11-01-06 28 119370 4220
7375 11-01-06 28 124800 4420
7375 Hold H
Location of Sam
Set Number
1
2
3
4
5
6
2
3
4
Ie
Location
Paving 66'N from NE bldg corner
Paving TN, 105'W from NE bldg corner
Paving 23'N, 193'W from NE bldg corner
Paving 15'N, 293'W from NE bldg corner
Paving 63'N, 378'W from NE bldg corner
Pavin 66'N, 48TW from NE bid corner
Mix Identification
1551
REPORT NO. 136
REG PROJECT NO. 13335
SAMPLE DATE: 10-04-06
TECHNICIAN: 0 Decuir
PAGE: 1 of 2
ecified Stren
4000
4130
4480
4210
4320
2424 STUTZ DR . SUITE 400 . DALLAS TX 75235 . TEL [214] 3505600 . FAX [214] 3500019
REPORT NO 136
REG PROJECT NO 13335
SAMPLE DATE. 10-04-06
PAGE 2of2
6
7377
7377
7377
7377
Date Tested
10-11-06
11-01-06
11-01-06
Hold
Age@
Test
7
28
28
H
1 0-11-06
11-01-06
11-01-06
Hold
7
28
28
H
Total Load
Ibs.
92930
124560
119410
69710
119880
119600
Mail
Distribution: (1) IDI/Mr Chris Parnell
(1) Raymond Construction/
Mr David Layne
(1) City of Coppell/Mr Larry Davis
(1) City of Coppell/Mr Lee Stone
Submitted by
2470
4240
4230
Air
Entrainment
23
21
37
25
46
42
4320
4240
Ticket
Number
7171530
7171545
7171555
7171568
7171585
7171602
REED ENGINEERING GROUP, LTD.
Original Signed By
Mickey Lawson
Assistant Manager, CMT
ML/lnc