Loading...
Duke Lesley-CS061026 DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke Lesley Addition, Blocks A, Band C, Preliminary Plat, to establIsh Blocks A, B and C, allowmg for the submIsSIOn of final plats pnor to the development on 184 5 acres of property located at the northwest corner of IH- 635 and Beltlme Road at the request of Duke Realty LP, bemg represented by Jack Evans, Pacheco Koch Consultmg Engmeers. ST AFF REP.: Gary Sieb PROJECT ID# PP-06-0058 DRC DATE: October 26,2006 and November 2,2006 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: ~ PRELIMINARY FIM1L RE1'lSED AFTER P&Z Concept Water/Sewer Plan- . Please provide additional detail on how sewer service will be provided to all parts of the development. . Water lines in Lesley Drive and Belt Line Rd. are too long to dead end. Please connect these lines. Concept Draina~e Plan - . Additional information is needed on the capacity of the "Public System" to the south. TxDOT approval will be required to connect to this system. . Additional information is needed on how you propose to convey the public storm water from Dividend Drive to the north. Drainage easements will need to be in place for the construction of this system. Concept Pavin~ Plan - . Lesley Drive should be a 37' back-to-back street in a 60' ROW rather than 28' in a 50' ROW. Minimum section is 8" paving on a 6" lime subgrade. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Duke Lesley Addition, Final Plat of Lesley Drive and the Extension of Dividend Drive, to allow the constructIOn of Lesley Dnve and the extensIOn of DIvIdend Dnve, contammg approxImately 11 54 acres of property located north of IH-635 and west of Beltlme Road at the request of Duke Realty LP, bemg represented by Jack Evans, Pacheco Koch Consultmg Engmeers. STAFF REP.: Gary Sieb PROJECT ID# FP-06-0059 DRC DATE: October 26, 2006 and November 2, 2006 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: ~PRELIMINARY FINllL REVISED liFTER P&Z 1. Is there any Right-of-Way Dedication Required for the proposed TxDOT frontage road? 2. The Thoroughfare Plan shows Lesley Drive as a C2U with a 60' ROW. This plat shows only 50' ROW dedication. 3. Is a 90' ROW for Dividend Drive really needed? 4. It appears a portion of Dividend Drive encroaches on the property to the west of this site. How will that be addressed? DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: Public Hearin~ ZC-620 The Duke Lesley Addition, zomng change request from A (Agnculture) to LI (LIght Industnal) on Block A, contammg 111 6 acres of property and HC (Highway CommercIal) on Blocks Band C, contammg 72 9 acres of property to allow the development of mIxed uses, mcludmg retml, office, hotel and lIght mdustnal (office/warehouse) on a total of 1845 acres of property located at the northwest comer of IH-635 and Beltlme Road at the request of Duke Realty LP, bemg represented by Jack Evans, Pacheco Koch Consultmg Engmeers. STAFF REP.: Garv Sieb PROJECT ID# RZ-06-0057 DRC DATE: October 26,2006 and November 2,2006 CONTACT: Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686 COMMENT STATUS: ./ PRELIMINARY FIN11L REVISED .1FTER P&Z No comments.