Loading...
PA9901-LR061107LAWRENCE ENGINEERING ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 Concrete Compression Test Report Client: City of Copped Report Distribution: (1) Larry Davis - City of Coppell Project: Wagon Wheel Park (1 1 ) John Elias - Parks Dept. Parking Lot Improvements LE Report No.: C06- 0903 -016 Report Date: 11/07/2006 I_ Specifications 355801 Time Batched: 8:33 AM Test Data Strength 3600 psi @ 28 Days Placement Date 11/02/2006 Slump 3 in min 5 in max Sampled By Joe Flores Air Content 3 % min 6 % max Weather Cold /Windy Concrete Temperature 95' F max Supplier /Mix TXI/8274 Ambient Tempe n/a Air Content Method ASTM C-231 -B i Field Data Set #1 Ticket Number: 355801 Time Batched: 8:33 AM Time Sampled: 9:10 AM Slump: 5 in Air Content: 4.3 % Unit Weight: Concrete Temperature: 70' F Ambient Temperature: 56° F Yardage (c.y.): 10 of 50 Placement Location: Sidewalk 10' S. of TC 21.76 of grading plan L -3 Sample Location: Concrete Compression Test Results Cylinder Age Max Load Set # # Test Date (days) (lbs. force) Area Stren th Fracture (sq.in.) (psi Type 1 WWP11020601 11/09/2006 7 104070 28.2.7 3680 unbonded cap 1 WWP11020602 11/30/2006 28 1 WWP11020603 11x30/2006 28 1 WWP11020604 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by LE are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or C1231. LAWRENCE ENGINEERING G ry D. Dry Construction Materials Manager The results presented in this report pertain only to the specific items tested. -his report �Nas produced `or the exclusive use of the client- Any repreeuction cf this report or any part therein is strictly pronibited mthout the express written consent of LE. LAWRENCE ENGINEERING _ ENVIRONMENTAL - GEOTECHNICAL - CONSTRUCTION MATERIALS TESTING 12500 Schroeder Suite B Dallas, Texas 75243 Phone (972) 497 -9100 Fax (972) 497 -9108 I• Concrete Compression Test Report Client: City of Coppell Report Distribution: (1) Larry Davis - City of Coppell Project: Wagon Wheel Park (1) John Elias - Parks Dept. Parking Lot Improvements LE Report No.: C06- 0903 -015 Report Date: 11107/2006 Sp e c ifications Cylinder y # T Data Age Max Load Area (days) (lbs. force) (sq.in.) Strength 3600 psi @ 28 Days Placement Date 11/01/2006 Slump 3 in min 5 in max Sampled By Joe Flores Air Content 3 % min 6 % max Weather Cold/Windy Concrete Temperature 95° F max Supplier /Mix TXI/8274 Ambient Temperature n/a Air Content Method ASTM C -231 -B Ticket Number: 354625 Time Batched: 6:58 AM Time Sampled: 7:30 AM Slump: 5 in Air Content: 3.9% Unit Weight: Concrete Temperature: 70° F Ambient Temperature: 47° F Yardage (c.y.): 20 of 50 Placement Location: Paving 25' North of South parking lot entrance Sample Location: Ccarfsimr' 7 7 7 Set # Cylinder y # Test Date Age Max Load Area (days) (lbs. force) (sq.in.) Stren th Fracture (psi Type 1 WWP11010601 11/08/2006 7 110540 28.27 3910 unbonded cap 1 WWP11010602 11/29/2006 28 1 WWP11010603 11/29/2006 28 1 WWP11010604 Hold Normal cylinder size: 6" x 12" Field and laboratory tests by LE are per applicable ASTM Standards: C31, C39, C138, C143, C172, C1064, and C617 or .C1231 LAWRENCE ENGINEERING / D. Dry Construction Materials Manager The results presented in this report pertain only to the specific items tested. This report was produced for the exclusive use of the client. Any reproduction of this report, or any part therein, is strictly prohibited without the express written consent of LE. Page I of 1 01