Sandy Lk Cross 2R-CS060725T H E C I T Y O F
COFFELL
July 25, 2006
Mr. Thomas J. Whan
Creekside Construction, Ltd.
1260 Kristen Lane, Suite 1
Wylie, TX 75098
RE: Sandy Lake Crossing Addition, Lot 2R, Block 1
Dear Mr. Whan:
FILE
The City of Coppell Engineering Department provided inspection service at the referenced location
on Saturday, July 22, 2006. The overtime rate including salary and benefits is $54.00 per hour.
Two hours were charged to your company on that date.
Please send a copy of this letter along with your check for $108.00, payable to the City of Coppell
to the following address:
City of Coppell Finance Dept.
255 Parkway Blvd
P.O. Box 9478
Coppell, TX 75019
As a reminder, Overtime should be scheduled by 12:00 p.m. on the Wednesday prior to work on
Saturday.
If you should have any questions, please call (972) 304 -7044
Sincerely,
Keith R. Marvin, P.E.
Assistant City Engineer
Office Phone: (972) 304 -7044
Fax: (972) 304 -3570
cc: Finance Dept., Teri Brown
Project Fee File
C. :It WA * F 17) is0 Y 94 El P F I L. � X _ O I # E 1 1 2, 4 1, Z )02 2 * I- A X 972/304 3 6 7 3