Loading...
DR0601-CS060821T H E: C 1 T Y O F COFPELL 4 August 21. 2006 Knox Ross, Secretary /Treasurer Ed A. Wilson, Inc. 2526 W. Pafford St. Fort Worth, TX 76610 RE: MacArthur Blvd. Cribbs Dr. Drainage Project 4 DR 06 -01 Final Acceptance Dear Mr. Ross: FILE Representatives of the City of Coppell have confirmed a final inspection of the drainage facilities for the referenced project. The two -year maintenance aggreement will commence when we receive the maintenance bond and as -built drawings. Maturity on the bond will be two years from the date we receive the bond. A follow -up inspection of the facilities will be conducted prior to the lapse of the two -year bond period. If any punchlist items are noted at that time, you will be contacted to make repairs. Thanks for your cooperation. Sincerely. -.)6, )09Q � Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: Ken Griffin, P.E., Director ofEngirneering & Public Works Glerm Hollo P.I ., Asst. Director of• Public Works Greg .Tones, Chief Building Official Tim Oates, Fire Marshal Jennifer Armstrong, Finance Director Keith Marvin, P.E. Assistant City Engineer I F hW ,- * F. R i ,Z * PL C l 1 7 0 .. * . -. L _ ' F C.1 . 2 ,_ A J6 1