DR0601-CN060512 (2)LAWRENCE ENGINEERING Environmental - Geotechnical - Material Testing May 12, 2006 Ms. Suzan Taylor C.I.P. Coordinator City of Coppell 255 Parkway P.O. Box 9478 Coppell, Texas 75019 P06 -0509 Phone 972 - 304 -7019 Fax 972 - 304 -3570 RE: Budget Estimate for Construction Materials Testing of MacArthur Blvd. and Cribbs Drive Drainage Project DR 06 -01 City of Coppell, Texas Dear Ms. Taylor, Lawrence Engineering (LE) is pleased to be selected for the construction materials testing services for the MacArthur Drive and Cribbs Drive Drainage Project at Coppell, Texas. Our scope of services is based on our understanding of the project plans and project specifications. In addition to specific information provided, LE has comprised this project fee schedule based on an estimated duration of the construction period and typical construction methodology. Therefore, we request that you carefully review the on -site duration and frequency of testing to compare with your estimated construction schedule. As you know, our cost is directly dependent upon the time duration and construction methodology utilized. Scope of Services LE proposes to provide the following Construction Materials Testing Services for the MacArthur Drive and Cribbs Drive Drainage Project as required by the construction drawings and project specifications. Concrete and Flowable Fill Placement Inspection LE will provide a full time concrete technician during concrete and flowable fill placements. This includes the concrete pavement and any other flowable fill placements. The project superintendent will be notified of any discrepancies noted during visual observation. Concrete and flowable fill samples will be taken at appropriate intervals as determined by the project specifications. Concrete and flowable fill samples will be tested for temperature, entrained air content, slump, and compressive strength. 12500 Schroeder' Suite B • Dallas, Texas 75243 ' PHN 972 - 497 -9100 • www.lawrenceengineering.com � 4"wow MacArthur Blvd. and Cribbs Drive Drainage Project Ms. Suzan Taylor P06 -0509 May 15, 2006 Cost Estimate Presented on Table I attached is our cost estimate for this project. LE's estimates of testing quantities are based upon material estimates obtained from the Project Construction Drawings and assumed accepted industry standards for items not specified. We believe that our total cost estimate is realistic for this project; however, this estimate may be increased or decreased depending upon the actual project progress and the conditions encountered during project construction. These are estimates. Consequently, billings only for services rendered will be based primarily upon the unit rates presented in Table I. An invoice for services performed during each month will be sent within the first 10 days of the following month. Payment for our services will be due within 30 days of receipt of invoice. Schedule Lawrence Engineering is prepared to begin work immediately upon notification to proceed from the project representative. We are prepared to respond to your needs with due diligence in a timely fashion, as well as establish a level of communication which facilitates progress. Acceptance Lawrence Engineering is committed to, and capable of, providing the required materials engineering and testing services that are necessary for timely and professional project performance. LE's engineering technicians are either certified by the American Concrete Institute and National Institute for Certification in Engineering Technologies (NICET) or enrolled in certification programs. Lawrence Engineering is regularly inspected by the Cement and Concrete Reference laboratory (CCRL), is accredited by American Association of State Highway and Transportation Official (AASTHO), and is certified by North Central Texas Region Certification Agency as Disadvantage Business Enterprise (DBE). We thank you for your consideration of this proposal and look forward to serving your professional needs on this project. If you require further information, please do not hesitate to contact us. Sincerely, Lawrence Engineering Rolando Ramirez Project Manager Lawrence Engineering -/� %.Z "l Gary D. Dry CMT Manager 12500 Schroeder • Suite B • Dallas, Texas 75243 • PHN 972 -497 -9100 • www.lawrenceengineering.com Table I Construction Materials Testing for MacArthur Blvd. and Cribbs Dr. Drainage Project DR 06 -01 City of Coppell Lawrence Engineering Proposal No. P06 -0509 15- May -06 NOTES: 1. Overtime and retest confirmation will be invoiced to project General Contractor. (If required) Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked on the project outside the normal working hours of 7:00 am to 5:00 p.m., over eight hours per day, excluding travel time to and from the jobsite, Monday through Friday. Services performed on Saturday and Sunday will be billed at 1.5 times the regular rate. Services performed on recognized holidays will be billed at 2.0 times the regular hourly rate. 2. All laboratory test fees are F.O.B our laboratory; additional charge for sample pickup may apply. 3. Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal to portal. 4. Additional test not specified in this proposal will be quoted upon request. Estimated I Unit I Estimated Service Description Quantity Units Price Cost Concrete Placement Inspection Concrete Technician - Portal to Portal (min. 2 hours per trip) 20 Hours $34.00 $680.00 Compressive Strength Test Cylinders 32 Each $14.50 $464.00 Trip Charge - Vehicle Usage 8 Each $25.00 $200.00 Subtotal $1,344.00 Proiect Management Project Manager - General Project Coordination /Report Review 2 Hours $65.00 $130.00 Subtotal $130.00 Estimated Total Cost 1 $1,474.00 NOTES: 1. Overtime and retest confirmation will be invoiced to project General Contractor. (If required) Overtime rates of 1.5 times the regular hourly rate will be charged for hours worked on the project outside the normal working hours of 7:00 am to 5:00 p.m., over eight hours per day, excluding travel time to and from the jobsite, Monday through Friday. Services performed on Saturday and Sunday will be billed at 1.5 times the regular rate. Services performed on recognized holidays will be billed at 2.0 times the regular hourly rate. 2. All laboratory test fees are F.O.B our laboratory; additional charge for sample pickup may apply. 3. Any additional tests will be billed on a hourly rate and charged at the applicable rate, portal to portal. 4. Additional test not specified in this proposal will be quoted upon request. LAWRENCE ENGINEERING Environmental - Geotechnical • Material Testing PROPOSAL ACCEPTANCE AGREEMENT Description of Services: Construction Materials Testing Project Name: MacArthur Blvd. and Cribbs Drive Drainage Improvements Project Location: Coppell, Texas LE Proposal #: P06 -0509 APPROVAL AND PAYMENT OF CHARGES. Fees will be billed to the account of, and invoices will be mailed to: Firm: City of Coppell Attention: Kenneth M. Griffin, P.E., Dir. of Engineering Address: 255 Parkway Blvd. City: Coppell State: TX Zip: 75019 Telephone 972 304CL3686 �2 30 W —70 4 1 Proposal Accepted By: Title: Date Accepted: PAYMENT TERMS: Payable in accordance with the attached agreement(s). Invoices for completed work will be issued every month for continuous or extended projects unless otherwise mutually agreed upon in writing. PROPERTY OWNER IDENTIFICATION: (If other than above) Name: Address: City: Telephone_ SPECIAL PROVISIONS: State: Fax: Zip: Please note that Lawrence Engineering reserves the right to withhold all reports until such time as Lawrence Engineering receives a signed Proposal Acceptance Agreement or other written authorization referencing this agreement in its entirety This AGREEMENT, together with Lawrence Engineering's Proposal, Unit Fee Schedule and the attached agreement(s), as indicated below, constitutes the entire agreement between the client and Lawrence Engineering and supersedes all prior written or verbal understandings. • Professional Services Agreement • Agreement for Materials Testing Services